<strong>Wambo</strong> <strong>Coal</strong> Pty Limited <strong>AEMR</strong> <strong>2011</strong>-<strong>2012</strong><br />

NO<br />

DATE<br />

RECEIVED<br />

AREA<br />

RESPONSIBLE<br />

CAT.<br />

ISSUE<br />

9 19/05/<strong>2012</strong> Downer EDI 1 Hydraulic Oil Leak<br />

10 21/05/<strong>2012</strong> <strong>Wambo</strong> 1 Drill site established on unapproved site<br />

11 21/05/<strong>2012</strong> <strong>Wambo</strong> 2 C11 Dam Seepage<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

ACTION TAKEN<br />

made operational, with four watercarts operating by<br />

3.30pm that day.<br />

Shift supervisors have been reminded of their duty to<br />

report and address dust generating conditions, as per<br />

the Downer EDI Mining Standard Work Practice -<br />

Dust Management (SWP 1021).<br />

On Monday 07 May, operations were modified, in<br />

accordance with SWP 1021, due to dry, windy<br />

conditions.<br />

Driller noticed oil coming from rig during operation.<br />

Immediately shut down and isolated machine.<br />

Then proceeded to contain spill using provided spill<br />

kit materials.<br />

Maintenance inspection and testing was carried out<br />

by Onedrill<br />

Contractors accidentally established drill site at a<br />

location on <strong>Wambo</strong> owned land in<br />

The error arose through confusion between this site<br />

and another nearby site that had been approved.<br />

Environmental Dpt spoke with both the Geologists<br />

and Contractors to ensure correct Surface<br />

Disturbance permit process of site approval and<br />

establishment are being followed.<br />

Identified that flow of documentation was not<br />

reaching all personnel involved directly in setting up<br />

the site which allowed for the wrong site to be<br />

established.<br />

All personnel involved are now to receive a copy of<br />

relevant documents. Supervisor must physically visit<br />

the site with the personnel.<br />

A discharge to ground occurred at <strong>Wambo</strong> <strong>Coal</strong><br />

Mine, when mine water seeped through spoil from<br />

C11Dam (the dam) onto a neighbouring mine’s land.<br />

The discharge was first noticed on the 21 May <strong>2012</strong>.<br />

Diesel pump installed in C11 to pump down water<br />

level<br />

Farm dam on United land reinstated to catch<br />

seepage. Sediment control placed downstream.<br />

Vacuum truck used to recover seepage water from<br />

downstream of farm dam.<br />

Appendix 3: Summary of Environmental Incidents