<strong>Wambo</strong> <strong>Coal</strong> Pty Limited <strong>AEMR</strong> <strong>2011</strong>-<strong>2012</strong><br />

NO<br />

DATE<br />

RECEIVED<br />

AREA<br />

RESPONSIBLE<br />

CAT.<br />

ISSUE<br />

<br />

<br />

ACTION TAKEN<br />

being laid in creek bed and spray mulch on disturbed<br />

creek banks.<br />

Additional sediment control structures, including<br />

sediment pond, being installed for wider project<br />

disturbance area.<br />

Communication to project supervisors and toolbox<br />

talk to project workforce, about importance of<br />

maintaining the integrity of sediment/ erosion control<br />

measures.<br />

3 10/11/<strong>2011</strong> Downer EDI 1 Small spill in fuel farm<br />

4 28/12/<strong>2011</strong> Downer EDI 1 Excessive dust Generation<br />

5 21/01/<strong>2012</strong> Downer EDI 1 Diesel Fuel Leak<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Approx. 50L diesel was released into the fuel farm<br />

bunded area when an operator failed to turn off the<br />

valve prior to removing the hose.<br />

No contaminated soil or water, the fuel will be<br />

pumped out of the bund and disposed with the waste<br />

oil.<br />

Open cut areas not of operational necessity were<br />

closed off to heavy vehicle traffic to reduce watering<br />

footprint.<br />

Grading works are ongoing to remove the layer of<br />

loose surface dust and generally improve road/ramp<br />

surface conditions.<br />

Toolbox talks given to operators regarding driving to<br />

conditions, including slowing down in dry and/or<br />

windy conditions to reduce wheel generated dust.<br />

The Downer EDI Standard Work Practice (SWP) for<br />

Dust Control is being updated to improve operational<br />

response to dusty conditions.<br />

Approximately 600 litres of fuel was leaked from a<br />

punctured hose on a D10T Dozer while ripping a<br />

ramp in Montrose Open Cut<br />

The leak was quickly reported to OCE and Workshop.<br />

As the dozer was operating within the Blast Exclusion<br />

Zone the OCE requested that it move to a safe<br />

location outside of the zone before shutting down<br />

Once out of the blast area, the Dozer was isolated<br />

and absorbent materials placed around to contain the<br />

leak.<br />

Contaminated soil to be Bio-remediated once the<br />

dozer is repaired and moved away from the spill site.<br />

The operator was disciplined and retrained in the<br />

Appendix 3: Summary of Environmental Incidents