01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUMP<br />

SUMP<br />

UNITED COLLIERY<br />

GOLDEN<br />

HIGHWAY<br />

WOMBAT DUMP<br />

MONTROSE PIT<br />

WAMBO OPEN CUT<br />

HUNTER PIT TAILINGS DAM<br />

SOUTH BATES PIT<br />

NORTH WAMBO CREEK<br />

DIVERSION<br />

WOLLEMI BOXCUT<br />

STAGE 3 CREEK<br />

DIVERSION<br />

NORTH WAMBO UNDERGROUND<br />

HOMESTEAD<br />

PIT<br />

WAMBO ADMIN<br />

WAMBO CHPP<br />

NORTH WAMBO<br />

BROOK<br />

CREEK<br />

WOLLOMBI<br />

STONY<br />

CREEK<br />

SOUTH<br />

WAMBO<br />

CREEK<br />

Legend<br />

Colliery Holding Boundary<br />

DA Approved Open Cut Limits<br />

MOP Open Cut Limits<br />

<strong>Wambo</strong> Owned Land<br />

North <strong>Wambo</strong> Underground Workings (Existing)<br />

North <strong>Wambo</strong> Underground Workings (Proposed)<br />

Open Cut Mining at 30th June <strong>2012</strong><br />

Dams<br />

Creeks<br />

Prepared by Pegasus Technical CAD FILE: 08671A<br />

WAMBO COAL<br />

EXTENT OF MINING OPERATIONS<br />

FIGURE 2.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!