Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy

peabodyenergy.com
from peabodyenergy.com More from this publisher
01.11.2014 Views

Transect Left Bank 1 Upstream 2 Right Bank 1 Downstream 2 15A 2011 15A 2010 1 = Bank side was assessed while looking upstream. Left and right bank photos were taken from any position along the transect that allowed as much as possible of the bank to be contained within the photograph. 2 = Upstream and downstream photographs were taken while standing in the centre of the creek channel. 2011 Annual Ecological Monitoring Report, Final Report, May 2012 Page 114

Appendix H Staff Qualifications 2011 Annual Ecological Monitoring Report, Final Report, May 2012 Page 115

Transect Left Bank 1 Upstream 2 Right Bank 1 Downstream 2<br />

15A<br />

<strong>2011</strong><br />

15A<br />

2010<br />

1 = Bank side was assessed while looking upstream. Left and right bank photos were taken from any position along the transect that allowed as<br />

much as possible of the bank to be contained within the photograph.<br />

2 = Upstream and downstream photographs were taken while standing in the centre of the creek channel.<br />

<strong>2011</strong> Annual Ecological Monitoring Report, Final Report, May <strong>2012</strong> Page 114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!