Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
Transect Left Bank 1 Upstream 2 Right Bank 1 Downstream 2 15A 2011 15A 2010 1 = Bank side was assessed while looking upstream. Left and right bank photos were taken from any position along the transect that allowed as much as possible of the bank to be contained within the photograph. 2 = Upstream and downstream photographs were taken while standing in the centre of the creek channel. 2011 Annual Ecological Monitoring Report, Final Report, May 2012 Page 114
Appendix H Staff Qualifications 2011 Annual Ecological Monitoring Report, Final Report, May 2012 Page 115
- Page 303 and 304: Plot: V6-B2c Flora Species Braun Bl
- Page 305 and 306: Plot: V6-B4 Flora Species Braun Bla
- Page 307 and 308: Plot: V9-B1 Flora Species Braun Bla
- Page 309 and 310: Plot: V1--A1 Flora Species Braun Bl
- Page 311 and 312: Plot: V1--B1 Flora Species Braun Bl
- Page 313 and 314: Plot: V11-B1 Flora Species Braun Bl
- Page 315 and 316: Plot: V13-B1 Flora Species Braun Bl
- Page 317 and 318: Plot: V14-A1 Flora Species Braun Bl
- Page 319 and 320: Plot: V14-B2 Flora Species Braun Bl
- Page 321 and 322: Table 1: Introduced Species Frequen
- Page 323 and 324: Appendix D Fauna Species List 2011
- Page 325 and 326: Family Scientific Name Common Name
- Page 327 and 328: Family Scientific Name Common Name
- Page 329 and 330: Appendix E Riparian Condition Asses
- Page 331 and 332: Understorey (shrub layer) (Score) C
- Page 333 and 334: Surface Stability (Score) Comments
- Page 335 and 336: Appendix F Riparian Condition Score
- Page 337 and 338: Overstorey Understorey Ground Cover
- Page 339 and 340: Overstorey Understorey Ground Cover
- Page 341 and 342: Table 5-4: 2011 Stoney Creek Ripari
- Page 343 and 344: Transect Left Bank 1 Upstream 2 Rig
- Page 345 and 346: Transect Left Bank 1 Upstream 2 Rig
- Page 347 and 348: Table 5-6: 2011 North Wambo Riparia
- Page 349 and 350: Transect Left Bank 1 Upstream 2 Rig
- Page 351 and 352: Transect Left Bank 1 Upstream 2 Rig
- Page 353: Transect Left Bank 1 Upstream 2 Rig
- Page 357 and 358: Curriculum Vitae - CONTINUED - proj
- Page 359 and 360: Curriculum Vitae ROB SANSOM Botanis
- Page 361 and 362: Curriculum Vitae ANDREW SMITH Field
- Page 363 and 364: Appendix 3 Summary of Environmental
- Page 365 and 366: Wambo Coal Pty Limited AEMR 2011-20
- Page 367 and 368: Wambo Coal Pty Limited AEMR 2011-20
- Page 369 and 370: Wambo Coal Pty Ltd AEMR 2011-2012 N
- Page 371 and 372: Wambo Coal Pty Ltd AEMR 2011-2012 1
- Page 373 and 374: Wambo Coal Pty Ltd AEMR 2011-2012 3
- Page 375 and 376: Number Date (d/m/yr) Complainant ID
- Page 377 and 378: Wambo Coal Pty Ltd AEMR 2011-2012 7
- Page 379 and 380: Appendix 5 Rehabilitation Plan
Transect Left Bank 1 Upstream 2 Right Bank 1 Downstream 2<br />
15A<br />
<strong>2011</strong><br />
15A<br />
2010<br />
1 = Bank side was assessed while looking upstream. Left and right bank photos were taken from any position along the transect that allowed as<br />
much as possible of the bank to be contained within the photograph.<br />
2 = Upstream and downstream photographs were taken while standing in the centre of the creek channel.<br />
<strong>2011</strong> Annual Ecological Monitoring Report, Final Report, May <strong>2012</strong> Page 114