2010-<strong>2011</strong> <strong>AEMR</strong><br />

No DP&I Issue DP&I Action Description Summary Due Comments<br />

3 Water Management Structures Provide a timetable for the upgrade of the<br />

Open cut workshop area, including for the<br />

drain to the Box Cut Dam<br />

Completed in<br />

May <strong>2012</strong><br />

The upgrades and de-silting of the drain and the installation of<br />

sediment traps around the Open Cut Workshop were completed<br />

in May <strong>2012</strong><br />

The de-silting of the Eagles Nest Dam has<br />

not been carried out. Please submit a<br />

timetable for the completion of this activity<br />

August <strong>2012</strong> De-silting of Eagles Nest Dam commenced late during the<br />

<strong>2011</strong>-<strong>2012</strong> reporting period. Works expected to be complete by<br />

August <strong>2012</strong>. See Section 3.6 of the <strong>AEMR</strong>.<br />

Continue to monitor the water leaking from<br />

Hunter Tailing Pit into the C11 Dam and<br />

advise of any changes to water quality in<br />

this area.<br />

Ongoing Monthly inspections continue to monitor. V-notched weir and<br />

sediment catchment structure has been installed to capture and<br />

accumulate sediment. Water from Hunter Tailings Pit is<br />

contained within C11 dam.<br />