2010-<strong>2011</strong> <strong>AEMR</strong><br />

Table 1.7 – Actions from 2010-<strong>2011</strong> Annual Environmental Management Report Review<br />

No DRE Issue DRE Action Description Summary Due Comments<br />

1 No bioremediation site Details <strong>Wambo</strong> <strong>Coal</strong>’s spill management<br />

documentation<br />

30 April <strong>2012</strong> A new location was selected for the bioremediation area. For<br />

further details please refer to Section 3.6.<br />

2 Contractor laydown areas not<br />

formalised<br />

Develop formal laydown areas Next <strong>AEMR</strong> WCPL currently investigating options to centralise a contractor<br />

laydown area and the outcomes provided in the next <strong>AEMR</strong>.<br />

3 Lack of progressive rehabilitation<br />

undertaken in reporting period<br />

Immediate address of temporary<br />

stabilisation cover of disturbed areas<br />

1 March <strong>2012</strong> Please refer to Section 5.0 of the <strong>AEMR</strong>.<br />

Need to catch up and redress the shortfall in<br />

progressive rehabilitation in the <strong>Wambo</strong><br />

<strong>Coal</strong> MOP commitments<br />

Throughout<br />

<strong>2012</strong> by next<br />

<strong>AEMR</strong><br />

Please refer to Section 5.0 of the <strong>AEMR</strong>.<br />

4 North East Tailings Dam<br />

Rehabilitation 4 Progress reports for the tailings dam<br />

rehabilitation to be provided to DII’s<br />

Environmental Sustainability Unit as well as<br />

Mine Safety Department.<br />

Report progress<br />

in next <strong>AEMR</strong>.<br />

<strong>Wambo</strong> commenced monthly reporting of the NETD<br />

rehabilitation status to the DII (Mine Safety) and the NSW Dam<br />

Safety Committee in October 2009. See Section 5.0 of the<br />

<strong>AEMR</strong> for further details.<br />

No DP&I Issue DP&I Action Description Summary Due Comments<br />

1 Rehabilitation No rehabilitation work was completed and<br />

the rehabilitation target was not achieved for<br />

the 2010-11 reporting period. The DP&I<br />

note in a letter dated 23 January <strong>2012</strong> that<br />

the mine was committed to rehabilitate<br />

approximately 40ha of the RL160<br />

overburden dump surface by June <strong>2012</strong>.<br />

30 June <strong>2012</strong> Please refer to Section 5.0 of the <strong>AEMR</strong>.<br />

2 Homestead Complex The Department is satisfied with the<br />

continuing work on the Homestead<br />

Complex, which appears to be progressing<br />

generally in accordance with the interim<br />

Conservation Management Plan dated 15<br />

August <strong>2011</strong><br />

Completed Please refer to Section 3.13.2 of the <strong>AEMR</strong><br />

4<br />

Carry over action form 2009/2010 <strong>AEMR</strong><br />

Page 16