2010-<strong>2011</strong> <strong>AEMR</strong><br />

1.5 Review of <strong>2011</strong>-<strong>2012</strong><br />

Objectives and Targets<br />

The objectives and targets for the <strong>2011</strong>-<strong>2012</strong><br />

reporting period were identified in the 2010-<strong>2011</strong><br />

<strong>AEMR</strong>. These are presented below in Table 1.6,<br />

including an assessment of whether or not the<br />

objectives and targets have been met.<br />

1.6 Actions from 2010-<strong>2011</strong><br />

<strong>AEMR</strong> Review<br />

The DTIRIS found that the 2010-<strong>2011</strong> <strong>AEMR</strong> was<br />

informative, well presented and acceptable for the<br />

reporting period. The DP&I also found the 2010-<br />

<strong>2011</strong> <strong>AEMR</strong> satisfied the requirements under<br />

Condition 5, Schedule 6 of DA 305-7-2003 and<br />

Condition 4, Schedule 6 of DA 177-8-2004.<br />

However both DTIRI and DP&I identified a number<br />

of actions for WCPL to address during the next<br />

reporting period. Actions from the <strong>AEMR</strong> site<br />

inspection on the 25 January <strong>2012</strong> are listed in<br />

Table 1.7.<br />

A review of the 2010-<strong>2011</strong> <strong>AEMR</strong> was undertaken<br />

by DTIRIS and DP&I. The review by both<br />

government departments included a site inspection<br />

on 25 January <strong>2012</strong> by DTIRIS and DP&I.<br />

Table 1.6 – Review of Objectives and Targets<br />

Objective<br />

Target<br />

<strong>2011</strong> – <strong>2012</strong><br />

Status<br />

<strong>2011</strong> – <strong>2012</strong><br />

Target<br />

<strong>2012</strong> - 2013<br />

Land rehabilitated (hectares) 76.2 40 3 40<br />

Land disturbed (hectares) 68.4 36.5 74.9<br />

Number of significant<br />

environmental incidents<br />

Number of regulatory<br />

penalties<br />

Annual Average % Waste<br />

Recycled<br />

Number of environmental<br />

newsletters distributed<br />

0 0 0<br />

0 1 0<br />

70 75 75<br />

4 2 3<br />

3 At the end of the <strong>2011</strong>-<strong>2012</strong> reporting period, WCPL have shaped approximately 40ha at RL160 in preparation for final rehabilitation<br />

planned for September <strong>2012</strong>.<br />