2010-<strong>2011</strong> <strong>AEMR</strong><br />

1.3.7 Subsidence Management Plan<br />

WCPL’s Underground operates under an approved<br />

Subsidence Management Plan (SMP). The SMP for<br />

First Workings was approved by the DTIRIS in<br />

October 2005 with mining commencing in<br />

November 2005. The SMP for Second Workings<br />

was lodged in March 2006 and was approved by the<br />

DTIRIS on the 11 December 2006. This SMP<br />

covers underground mining activities until 1/11/2013<br />

which includes longwall panels 1 through to 6 (LW<br />

1-6). The SMP also includes the management of<br />

environmental impacts associated with subsidence.<br />

Mine subsidence is discussed further in Section<br />

3.16.<br />

1.3.8 Emplacement Area Approvals<br />

Table 1.4 outlines previous emplacement approvals<br />

issued under Section 126 Approvals for<br />

Emplacement Areas (Dams). These emplacement<br />

areas can be seen in Figure 1.4. The Hunter Pit<br />

emplacement is the only current operational area.<br />

Rehabilitation of past emplacement areas continued<br />

this reporting period with these activities outlined in<br />

Section 2.5.1.3.<br />

DTIRIS a Section 101 amendment, replacing the<br />

original Section 127.<br />

A Section 100 Application for raising the tailings<br />

level in the Hunter Pit Dam was submitted to the<br />

NSW Department of Trade and Investment at the<br />

end of the <strong>2011</strong>-<strong>2012</strong> reporting period. The raising<br />

of this wall is part of the WCPL life of mine tailings<br />

strategy which will extend the tailings facility life<br />

through to 2014.<br />

1.3.9 EPBC Approval<br />

WCPL was granted approval (EPBC 2003/1138) in<br />

accordance with Environment Protection and<br />

Biodiversity Conservation Act, 1999 (EPBC Act) for<br />

the expansion of the mine on the 23 November<br />

2004. In accordance with the approval, WCPL have<br />

prepared a Flora and Fauna Management Plan to<br />

address the conditions set out in EPBC 2003/1138.<br />

1.4 Mine Contacts<br />

Table 1.5 outlines the contact details for site<br />

personnel responsible for mining, coal preparation,<br />

rehabilitation and environmental management at<br />

WCPL.<br />

A Section 127 Approval to Discontinue<br />

Emplacement Areas was granted on the 8<br />

September 2004 for the North East Tailings Dam<br />

(NETD). In July 2009 WCPL submitted to the<br />

Table 1.4 – Emplacement Area Approvals<br />

Date<br />

Granted<br />

Area Details Current Status<br />

Area No. 1 Whynot (South) Area Rehabilitated.<br />

28/08/1991<br />

Area No. 2 Ridge Open Cut and Cut 11N areas Capping complete.<br />

Area No. 3<br />

Ridge Portal/Western Open Cut<br />

Ridge Portal rehabilitated.<br />

Western Cut temporary<br />

rehabilitated.<br />

Area No. 4<br />

This comprised sub areas A and B as below:<br />

02/12/1993<br />

Area A<br />

A south east extension of the North<br />

East Open Cut<br />

Now called Charlies Hole. This<br />

area was rehabilitated during the<br />

reporting period<br />

Area B Original slurry drying pond area Rehabilitated.<br />

North Whynot Void - Rehabilitated.<br />

08/05/1995<br />

Area ‘C’ Open cut approval area number 8/8A<br />

Used as mine water storage. Not<br />

planned to be used for tailings.<br />

Hunter Pit Commenced filling in 29/03/2004 Current disposal area.<br />

23/01/2004 Area No. 1 Whynot (South) Area Rehabilitated.<br />