Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
2011-2012 AEMR Licence Number Table 1.3 – Water Licence Summary Description Facility Valid To Extraction Limits 20BL132753 Old Well No. 1 Well 28/07/2013 243ML/year 20BL166910 Dewatering (Bore No. 1) Bore 25/10/2013 450ML/ year 2 20BL167737 Well No. 2 Well 08/01/2011* 70ML/year 20SL033872 Wollombi Brook Pump Pump 06/07/2011* 750ML/year 20BL167810 Well – Domestic, Stock Well Perpetuity 11ML/year 20AL200631 Hunter River Pump Pump Perpetuity 1,000ML/year 20WA200632 Hunter River Pump Pump 30/06/2017 6ML/year 20BL168017 Dewatering (Bore No. 2) Bore 21/05/2012* 750ML/year 20BL168643 Dewatering Bore Bore 7/08/2013 300ML/year 20BL166438 Well - Stock Bore Perpetuity 5ML/year 20BL167738 Dewatering Bore Bore 11/09/2015 300ML/year 20BL168997 Piezometer Test Bore Perpetuity Groundwater monitoring 20BL168998 Piezometer Test Bore Perpetuity Groundwater monitoring 20BL168999 Piezometer Test Bore Perpetuity Groundwater monitoring 20BL169000 Piezometer Test Bore Perpetuity Groundwater monitoring 20BL170638 Piezometer Test Bore Perpetuity Groundwater monitoring 20BL166906 Spearpoints Irrigation Perpetuity 19ML/year 20BL172061 Dewatering (Bore No.2a) Bore 22/03/2014 750ML/year 20BL172156 Dewatering Excavation 3/05/2014 98ML/year 20BL171155 Dewatering Excavation 25/09/2012 243ML/year 20BL172237 GW14, GW18, GW21 Monitoring Bore Perpetuity Groundwater monitoring 20BL172238 GW12 Monitoring Bore Perpetuity Groundwater monitoring 20BL172240 GW15 Monitoring Bore Perpetuity Groundwater monitoring 20BL172242 GW16, GW17 Monitoring Bore Perpetuity Groundwater monitoring 20BL172244 GW20 Monitoring Bore Perpetuity Groundwater monitoring 20BL172255 GW22 Monitoring Bore Perpetuity Groundwater monitoring 20BL172256 GW13 Monitoring Bore Perpetuity Groundwater monitoring 20BL172256 GW19 Monitoring Bore Perpetuity Groundwater monitoring 20BL173032 Dewatering Bore Bore 30/11/2016 450ML/ year 2 20BL173033 Dewatering Bore Bore 30/11/2016 450ML/ year 2 20BL173034 Dewatering Bore Bore 30/11/2016 450ML/year 2 20BL173035 Dewatering Bore Bore 30/11/2016 450ML/year 2 Note: *Renewal licences pending 2 The volume of groundwater extracted from the works authorised by licenses 20BL173032, 20BL173033, 20BL173034, 20BL173035 and 20BL166910 shall not exceed 450 megalitres in any 12 month period commencing 1 st July. Page 10
SUMP SUMP 5 UNITED COLLIERY GOLDEN GW16 GW17 WOMBAT DUMP HIGHWAY MONTROSE PIT WAMBO OPEN CUT HUNTER PIT TAILINGS DAM NORTH WAMBO CREEK DIVERSION GW19 SOUTH BATES PIT STAGE 3 CREEK DIVERSION GW20 7 WOLLEMI BOXCUT HOMESTEAD PIT GW21 WAMBO CHPP GW18 WAMBO ADMIN NORTH WAMBO UNDERGROUND 2 12 NORTH 9 13 3 8 WAMBO CREEK 1 WOLLOMBI 4 BROOK GW14 GW15 STONY GW12 11 CREEK 10 SOUTH 6 WAMBO CREEK GW22 GW13 Legend Colliery Holding Boundary DA Approved Open Cut Limits MOP Open Cut Limits Wambo Owned Land Pump/well/bore Locations 8 Dams Creeks Prepared by Pegasus Technical CAD FILE: 08669A Licence Number Description Reference Number 20BL 132753 Old Well No. 1 1 20BL 166910 No.1 Dewatering Bore 2 20BL 167737 Well No. 2 3 20SL 033872 Wollombi Brook Pump 4 20AL200631 20WA200632 Hunter River Pump 5 Hunter River Pump 20BL 168017 No.2 Dewatering Bore 6 20BL 172061 No.2a Dewatering Bore 6a 20BL 168643 Dewatering Bore 7 20BL 167738 Dewatering Bore 8 20BL 168997 Piezometer 9 20BL 168998 Piezometer 10 20BL 168999 Piezometer 11 5 Extraction Limits 243 ML/year limit 450 ML/year limit 70 ML/year limit 750ML/year limit. 1000ML/year limit. 6ML/year limit. 750ML/year limit. 750ML/year limit. 300ML/year limit. 300ML/year limit. Groundwater monitoring Groundwater monitoring Groundwater monitoring Licence Number Description Reference Number 20BL 169000 Piezometer 12 20BL 170638 Piezometer 13 20BL 172237 20BL 172238 20BL 172240 20BL 172242 20BL 172244 20BL 172255 20BL 172256 20BL 172256 Piezometer Piezometer Piezometer Piezometer Piezometer Piezometer Piezometer Piezometer GW14 GW18 GW22 GW12 GW15 GW16 GW17 GW20 GW22 GW13 GW19 WAMBO COAL WATER LICENSES AND PERMITS FIGURE 1.3 Extraction Limits Groundwater monitoring 5ML/year limit. Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring Groundwater Monitoring
- Page 1 and 2: Wambo Coal Pty Limited ANNUAL ENVIR
- Page 3 and 4: Name of Mine: Titles/Mining Lease:
- Page 5 and 6: 2011-2012 AEMR 2.8 Water Management
- Page 7 and 8: 2011-2012 AEMR 3.13.1 Aboriginal He
- Page 9 and 10: 2011-2012 AEMR List of Figures Figu
- Page 11 and 12: 2011-2012 AEMR List of Appendices A
- Page 13 and 14: 2011-2012 AEMR 1.0 Introduction 1.1
- Page 15 and 16: 2011-2012 AEMR Table 1.0 - Annual R
- Page 17 and 18: SUMP SUMP N NEW Muswellbrook LOCALI
- Page 19 and 20: 2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21: 2011-2012 AEMR 1.3.3 Environmental
- Page 25 and 26: 2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28: 2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30: 2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32: 2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34: 2011-2012 AEMR Table 2.1 - Producti
- Page 35 and 36: 2011-2012 AEMR The exposed coal is
- Page 37 and 38: 2011-2012 AEMR Figure 2.3 - Coal Ha
- Page 39 and 40: 2011-2012 AEMR January 2009, the wa
- Page 41 and 42: 2011-2012 AEMR Table 2.3 - Stored W
- Page 43 and 44: 2011-2012 AEMR Table 2.4 - WCPL Was
- Page 45 and 46: 2011-2012 AEMR reference creeks for
- Page 47 and 48: 2011-2012 AEMR The purpose of the e
- Page 49 and 50: SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52: 2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54: 2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56: 2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58: 2011-2012 AEMR Particulate Matter A
- Page 59 and 60: 2011-2012 AEMR Assessment criterion
- Page 61 and 62: 2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64: 2011-2012 AEMR Variations in TSS ob
- Page 65 and 66: 2011-2012 AEMR replacement program
- Page 67 and 68: 2011-2012 AEMR Table 3.2 - Groundwa
- Page 69 and 70: 2011-2012 AEMR Figure 3.13a - Groun
- Page 71 and 72: 2011-2012 AEMR 3.6 Contaminated Lan
SUMP<br />
SUMP<br />
5<br />
UNITED COLLIERY<br />
GOLDEN<br />
GW16<br />
GW17<br />
WOMBAT DUMP<br />
HIGHWAY<br />
MONTROSE PIT<br />
WAMBO OPEN CUT<br />
HUNTER PIT TAILINGS DAM<br />
NORTH WAMBO CREEK<br />
DIVERSION<br />
GW19<br />
SOUTH BATES PIT<br />
STAGE 3 CREEK<br />
DIVERSION<br />
GW20<br />
7<br />
WOLLEMI BOXCUT<br />
HOMESTEAD<br />
PIT<br />
GW21<br />
WAMBO CHPP<br />
GW18<br />
WAMBO ADMIN<br />
NORTH WAMBO UNDERGROUND<br />
2<br />
12<br />
NORTH<br />
9<br />
13<br />
3<br />
8<br />
WAMBO<br />
CREEK<br />
1<br />
WOLLOMBI<br />
4<br />
BROOK<br />
GW14<br />
GW15<br />
STONY<br />
GW12<br />
11<br />
CREEK<br />
10<br />
SOUTH<br />
6<br />
WAMBO<br />
CREEK<br />
GW22<br />
GW13<br />
Legend<br />
Colliery Holding Boundary<br />
DA Approved Open Cut Limits<br />
MOP Open Cut Limits<br />
<strong>Wambo</strong> Owned Land<br />
Pump/well/bore Locations<br />
8<br />
Dams<br />
Creeks<br />
Prepared by Pegasus Technical CAD FILE: 08669A<br />
Licence Number Description Reference<br />
Number<br />
20BL 132753 Old Well No. 1 1<br />
20BL 166910 No.1 Dewatering Bore 2<br />
20BL 167737 Well No. 2 3<br />
20SL 033872 Wollombi Brook Pump 4<br />
20AL200631<br />
20WA200632<br />
Hunter River Pump 5<br />
Hunter River Pump<br />
20BL 168017 No.2 Dewatering Bore 6<br />
20BL 172061 No.2a Dewatering Bore 6a<br />
20BL 168643 Dewatering Bore 7<br />
20BL 167738 Dewatering Bore<br />
8<br />
20BL 168997 Piezometer 9<br />
20BL 168998 Piezometer<br />
10<br />
20BL 168999 Piezometer<br />
11<br />
5<br />
Extraction Limits<br />
243 ML/year limit<br />
450 ML/year limit<br />
70 ML/year limit<br />
750ML/year limit.<br />
1000ML/year limit.<br />
6ML/year limit.<br />
750ML/year limit.<br />
750ML/year limit.<br />
300ML/year limit.<br />
300ML/year limit.<br />
Groundwater monitoring<br />
Groundwater monitoring<br />
Groundwater monitoring<br />
Licence Number Description Reference<br />
Number<br />
20BL 169000 Piezometer<br />
12<br />
20BL 170638 Piezometer<br />
13<br />
20BL 172237<br />
20BL 172238<br />
20BL 172240<br />
20BL 172242<br />
20BL 172244<br />
20BL 172255<br />
20BL 172256<br />
20BL 172256<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
Piezometer<br />
GW14<br />
GW18<br />
GW22<br />
GW12<br />
GW15<br />
GW16<br />
GW17<br />
GW20<br />
GW22<br />
GW13<br />
GW19<br />
WAMBO COAL<br />
WATER LICENSES AND PERMITS<br />
FIGURE 1.3<br />
Extraction Limits<br />
Groundwater monitoring<br />
5ML/year limit.<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring<br />
Groundwater Monitoring