01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A.2 <strong>Wambo</strong> Rail Spur Development Consent<br />

A.2.1 Relevant WCRS Development Consent Conditions<br />

The relevant noise criteria, as detailed in the Construction/Operational Noise Management Plan<br />

and Monitoring Programme (Resource Strategies, 2005), are reproduced below:<br />

DA 177-8-2004<br />

Schedule<br />

4<br />

Condition<br />

4 Construction Hours<br />

The Applicant shall ensure that all construction work<br />

is carried out from 7 am to 6 pm Monday to Saturday<br />

(inclusive) and 8 am to 6 pm Sundays and public<br />

holidays.<br />

5 Operating Hours<br />

The Applicant shall:<br />

(a) take all practicable measures to minimise train<br />

movements at the development on Friday evening<br />

(6pm-9pm) and Sunday morning (9am-12am) to the<br />

satisfaction of the Director-General.<br />

(b) report on the implementation and effectiveness of<br />

these measures to<br />

the satisfaction of the Director-General.<br />

6 The Applicant shall monitor the noise generated by<br />

the development at least four times a year at a<br />

minimum of 3 representative locations near the site,<br />

in general accordance with the NSW Industrial<br />

Noise Policy and AS1055-1997: Acoustics –<br />

Description and Measurement of<br />

Environmental.<br />

7 Before carrying out any development, the Applicant<br />

shall prepare a Noise Monitoring Program for the<br />

development to the satisfaction of the Director-<br />

General, which includes a noise monitoring protocol<br />

for evaluating compliance with the criteria in Table 2.<br />

2.1 CONSTRUCTION/OPERATION NOISE CRITERIA DA 177-8-2004<br />

The noise impact assessment criteria for construction and operation of the <strong>Wambo</strong> <strong>Coal</strong><br />

Terminal and Rail Spur (DA 177-8-2004) are presented in Table 1 for residential and<br />

sensitive receptors in the vicinity of the development.<br />

12384_R01.doc<br />

Page A.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!