01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The survey purpose is to quantify and describe the existing acoustic environment around<br />

WCM and WCRS and compare results with relevant development consent conditions or<br />

modelled EIS noise levels.<br />

1.2 Monitoring Locations and Frequency<br />

Table 1.1 outlines the monitor type and frequency for the noise monitoring locations shown<br />

in Figure 1.<br />

Table 1.1 WAMBO COAL MONITORING LOCATIONS AND FREQUENCY1<br />

Site<br />

Reference<br />

Site Location<br />

Monitor<br />

Type<br />

Consent Requirement Frequency 1<br />

N01 Lambkin Residence Attended Mine & Rail Spur<br />

Development Consents<br />

Quarterly<br />

N03 Kelly Residence Real-time &<br />

Attended<br />

N16 Muller Residence Real-time &<br />

Attended<br />

Mine Development Consent<br />

Mine Development Consent<br />

Continuous & Quarterly<br />

Continuous & Quarterly<br />

N20 Thelander Residence Real-time Mine Development Consent Continuous<br />

N21<br />

<strong>Wambo</strong> South<br />

Residence<br />

Real-time Mine Development Consent Continuous<br />

N22 3 Henderson Residence Attended Rail Spur Development<br />

Consent<br />

Quarterly<br />

N23 Redmanvale Road Attended Mine Development Consent Quarterly<br />

N24 Curlewis Residence Attended Mine & Rail Spur<br />

Development Consents<br />

N25 2 Dyson Residence Rail Pass-by Rail Spur Development<br />

Consent<br />

Quarterly<br />

Every fifth quarterly<br />

period<br />

Source: <strong>Wambo</strong> <strong>Coal</strong> Noise Monitoring Program – EMP011 2007.<br />

Notes: 1. Quarterly attended locations are shown in italics;<br />

2. Dyson required every fifth quarterly period (last monitored in Q2 <strong>2011</strong>); and<br />

3. Monitoring at N22 not undertaken after Quarter 3, 2010 due to a change of ownership (mine<br />

owned).<br />

12384_R01.doc<br />

Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!