1 INTRODUCTION<br />

1.1 Background<br />

Global Acoustics was engaged by <strong>Wambo</strong> <strong>Coal</strong> Pty Ltd to provide a summary of the<br />

quarterly environmental noise surveys conducted around <strong>Wambo</strong> <strong>Coal</strong> Mine (WCM), and the<br />

<strong>Wambo</strong> <strong>Coal</strong> Rail Spur (WCRS) from 1 July <strong>2011</strong> to 30 June <strong>2012</strong>.<br />

Monitoring was delayed several times during Quarter 2, <strong>2012</strong> due to train scheduling and the<br />

arrival of trains coinciding with acceptable meteorological conditions. As a result of trying to<br />

find a suitable time to undertake WCRS monitoring, the Quarter 2 <strong>2012</strong> survey was extended<br />

into August <strong>2012</strong>.<br />

The rail spur and mine operate under separate development consents and have been<br />

monitored separately. Reporting, however, has been combined in this document.<br />

<strong>Wambo</strong> <strong>Coal</strong> operates both open cut and underground mining operations from their mine at<br />

Warkworth, NSW. The open cut operations include use of heavy mobile equipment in open<br />

cut pits, on haul roads and on waste rock emplacements. The underground operations have<br />

surface facilities. Both operations utilise a coal handling and preparation plant (CHPP)<br />

including conveyors, bins and other material-handling infrastructure.<br />

The WCRS is located between Mt Thorley and Warkworth Village, New South Wales (as<br />

shown in Figure 1) and includes the following components:<br />

<br />

<br />

a product coal stockpile and reclaim area, product coal conveyer, train loadout bin, rail<br />

loop and a rail spur from the <strong>Wambo</strong> <strong>Coal</strong> Mine to Mount Thorley; and<br />

rail transport of product coal to the market, an intermittent activity that can take place at<br />

anytime.<br />

Attended environmental noise monitoring described in this report was undertaken on a<br />

quarterly basis at five sites during Quarters 3 and 4 <strong>2011</strong> and Quarters 1 and 2 <strong>2012</strong> around<br />

the mine. Figure 1 shows the monitoring locations.<br />

Two of the five monitoring locations are within the Noise Affectation Zone, as identified in<br />

EIS reports (<strong>Wambo</strong> Development Project EIS (Resource Strategies, 2003), and Jerrys Plains <strong>Coal</strong><br />

Terminal and Rail Line Environmental Impact Statement and Statement of Environmental Effects<br />

(CMPS&F, 1997)); as such, noise criteria do not apply directly to these properties. For these<br />

locations, measured noise levels from WCM and WCRS are compared against EIS modelled<br />

noise results. Compliance with modelled noise levels at these nearest receptors indicates<br />

compliance with development consent criteria at properties further away is likely.<br />

12384_R01.doc<br />

Page 1