Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal Mine Annual Report _____________________________________________ 2011/2012 Environmental Noise Monitoring Prepared for Wambo Coal Pty Limited _____________________________________
Wambo Coal Mine Annual Report 2011/2012 Environmental Noise Monitoring Reference: 12384_R01.doc Report date: 21 August 2012 Prepared for Wambo Coal Pty Limited PMB 1 Singleton NSW 2330 Prepared by Global Acoustics Pty Ltd PO Box 3115 Thornton NSW 2322 Prepared: Katie Weekes Environmental Scientist QA Review: Joel Curran Chemical Engineer (Acoustics) Global Acoustics Pty Ltd ~ Environmental noise modeling and impact assessment ~ Sound power testing ~ Noise control advice ~ Noise and vibration monitoring ~ OHS noise monitoring and advice ~ Expert evidence in Land and Environment and Compensation Courts ~ Architectural acoustics ~ Blasting assessments and monitoring ~ Noise management plans (NMP) ~ Sound level meter and noise logger sales and hire 12384_R01.doc Page i
- Page 141 and 142: Annual Environmental Management Rep
- Page 143 and 144: Annual Environmental Management Rep
- Page 145 and 146: Annual Environmental Management Rep
- Page 147 and 148: Annual Environmental Management Rep
- Page 149 and 150: Annual Environmental Management Rep
- Page 151 and 152: Annual Environmental Management Rep
- Page 153 and 154: Annual Environmental Management Rep
- Page 155 and 156: Releases to the Hunter River via th
- Page 157 and 158: Wambo Coal Pty Ltd AEMR 2011‐2012
- Page 159 and 160: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 161 and 162: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 163 and 164: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 165 and 166: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 167 and 168: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 169 and 170: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 171 and 172: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 173 and 174: Wambo Coal Pty Ltd AEMR 2011-2012 H
- Page 176 and 177: WAMBO HOMESTEAD 1 B L A S T V I B R
- Page 178 and 179: • individual wall panels — 20 H
- Page 180 and 181: 5 Figure 5: Setup for recording in
- Page 182 and 183: • spectrograms were constructed u
- Page 184 and 185: APPENDIX A Waveforms and spectrogra
- Page 186: East - west ground monitor (“tran
- Page 189 and 190: Channel 1: Channel 2: Channel 3:
- Page 191: Appendix 2F Noise Monitoring Result
- Page 195 and 196: Table of Contents 1 INTRODUCTION...
- Page 197 and 198: The survey purpose is to quantify a
- Page 199 and 200: 1.3 Terminology Some definitions of
- Page 201 and 202: 1.5 Wambo Coal Rail Spur Developmen
- Page 203 and 204: 2 METHODOLOGY 2.1 Assessment Method
- Page 205 and 206: Table 3.2 L A1(1 minute) dB GENERAT
- Page 207 and 208: Table 3.4 L A1(1 minute) dB GENERAT
- Page 209 and 210: Table 3.6 L A1(1 minute) dB GENERAT
- Page 211 and 212: Table 3.8 L A1(1 minute) dB GENERAT
- Page 213 and 214: Table 3.10L A1(1 minute) dB GENERAT
- Page 215 and 216: Table 3.12 L A1(1 minute) dB GENERA
- Page 217 and 218: Table 3.14 L A1(1 minute) dB GENERA
- Page 219 and 220: Table 3.16 L A1(1 minute) dB GENERA
- Page 221 and 222: A P P E N D I X A . D EVELOPMENT CO
- Page 223 and 224: Land Acquisition Criteria 7. If the
- Page 225 and 226: Table 1: Noise Impact Assessment Cr
- Page 227 and 228: 27 July 2012 Wambo Coal Pty Ltd GPO
- Page 229 and 230: Appendix 2G Flora & Fauna Monitorin
- Page 231 and 232: Results The onsite population of A.
- Page 233 and 234: We trust this report proves useful
- Page 235 and 236: Document Status Review Format Issue
- Page 237 and 238: ellied Glider (P. australis) and Sq
- Page 239 and 240: 3.3.4 Spotlighting 26 3.3.5 Herpeto
- Page 241: 1 Introduction RPS Australia East (
<strong>Wambo</strong> <strong>Coal</strong> Mine Annual Report<br />
<strong>2011</strong>/<strong>2012</strong><br />
Environmental Noise Monitoring<br />
Reference: 12384_R01.doc<br />
Report date: 21 August <strong>2012</strong><br />
Prepared for<br />
<strong>Wambo</strong> <strong>Coal</strong> Pty Limited<br />
PMB 1<br />
Singleton NSW 2330<br />
Prepared by<br />
Global Acoustics Pty Ltd<br />
PO Box 3115<br />
Thornton NSW 2322<br />
Prepared:<br />
Katie Weekes<br />
Environmental Scientist<br />
QA Review: Joel Curran<br />
Chemical Engineer (Acoustics)<br />
Global Acoustics Pty Ltd ~ Environmental noise modeling and impact assessment ~ Sound power testing ~ Noise<br />
control advice ~ Noise and vibration monitoring ~ OHS noise monitoring and advice ~ Expert evidence in Land<br />
and Environment and Compensation Courts ~ Architectural acoustics ~ Blasting assessments and monitoring ~<br />
Noise management plans (NMP) ~ Sound level meter and noise logger sales and hire<br />
12384_R01.doc<br />
Page i