<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

Table 1.1 – WCPL Development Consents<br />

Approval Name Number Approval<br />

Authority<br />

WCPL Mining Operations<br />

Date<br />

Granted<br />

Expiry Date<br />

Original consolidated consent for mine<br />

operations<br />

Modification to include Wollemi Box Cut and<br />

mine<br />

Modification to include Brambles <strong>Coal</strong><br />

Transport System<br />

DA 108/91 SSC 17/02/1992<br />

DA 108/91 SSC 16/10/1996<br />

DA 108/91 SSC 21/12/1998<br />

21 years from issue<br />

of coal lease<br />

21 years from issue<br />

of coal lease<br />

21 years from issue<br />

of coal lease<br />

Expansion of open cut and underground<br />

mining operations<br />

(MOD 1 ) Modification to allow DA No.<br />

108/91 to remain active<br />

(MOD 2 ) Re-orientation of the <strong>Wambo</strong><br />

seam underground mine longwall panels<br />

(MOD 3 ) Upgrade of open cut workshop<br />

and underground surface facilities<br />

(MOD 4 ) Extraction of the Wollemi<br />

remnants<br />

(MOD 5 ) Construction of a temporary bypass<br />

of North <strong>Wambo</strong> Creek<br />

(MOD 6 ) Construction of the North <strong>Wambo</strong><br />

Creek Diversion, gas and dewatering wells<br />

(MOD 7) Construction of internal water<br />

storage dam<br />

(MOD 8) Construction of internal water<br />

storage dam<br />

(MOD 9 ) Preparation of an Extraction Plan<br />

rather than a Subsidence Management Plan<br />

DA 305-7-2003 DP&I 04/02/2004 Nov 2026<br />

DA 305-7-2003 DP&I 2004 Nov 2026<br />

DA 305-7-2003 DP&I 04/05/2005 Nov 2026<br />

DA 305-7-2003 DP&I 10/01/2006 Nov 2026<br />

DA 305-7-2003 DP&I 19/04/2006 Nov 2026<br />

DA 305-7-2003 DP&I 20/10/2006 Nov 2026<br />

DA 305-7-2003 DP&I 25/01/2007 Nov 2026<br />

DA 305-7-2003 DP&I 22/06/2009 Nov 2026<br />

DA 305-7-2003 DP&I 27/08/2009 Nov 2026<br />

DA 305-7-2003 DP&I 28/02/<strong>2011</strong> Nov 2026<br />

(MOD 10) Montrose Water Storage Dam DA 305-7-2003 DP&I Pending<br />

WCPL Rail Development<br />

Jerry’s Plains Rail Line DA 235/97 SSC 16/07/1998 Perpetuity<br />

Modification to DA235/97 to correct<br />

residents list and allow the preparation of<br />

management plans in a staged manner<br />

DA 235/97 SSC 01/05/2003 Perpetuity<br />

Altered alignment of Jerry’s Plains Rail Line DA 235/97.3 SSC 03/12/2004 Perpetuity<br />

WCPL rail and coal loading infrastructure DA 306-7-2003 DP&I 01/06/2004 01/06/2025<br />

WCPL rail and coal loading infrastructure<br />

(altered alignment of rail loop)<br />

(MOD 1) Upgrade of Wallaby Scrub Road /<br />

Golden Hwy Intersection<br />

(MOD 2) Establishment of a locomotive<br />

provisioning facility adjacent to the WCPL<br />

Rail Loadout Facility<br />

DA 117-8-2004 DP&I 16/12/2004 16/12/2025<br />

DA 117-8-2004 DP&I 15/12/2006 16/12/2025<br />

DA 117-8-2004 DP&I 12/02/<strong>2012</strong> 16/12/2025<br />

Page 6