- Page 1 and 2:
Wambo Coal Pty Limited ANNUAL ENVIR
- Page 3 and 4:
Name of Mine: Titles/Mining Lease:
- Page 5 and 6:
2011-2012 AEMR 2.8 Water Management
- Page 7 and 8:
2011-2012 AEMR 3.13.1 Aboriginal He
- Page 9 and 10:
2011-2012 AEMR List of Figures Figu
- Page 11 and 12:
2011-2012 AEMR List of Appendices A
- Page 13 and 14:
2011-2012 AEMR 1.0 Introduction 1.1
- Page 15 and 16:
2011-2012 AEMR Table 1.0 - Annual R
- Page 17 and 18:
SUMP SUMP N NEW Muswellbrook LOCALI
- Page 19 and 20:
2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21 and 22:
2011-2012 AEMR 1.3.3 Environmental
- Page 23 and 24:
SUMP SUMP 5 UNITED COLLIERY GOLDEN
- Page 25 and 26:
2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28:
2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30:
2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32:
2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34:
2011-2012 AEMR Table 2.1 - Producti
- Page 35 and 36:
2011-2012 AEMR The exposed coal is
- Page 37 and 38:
2011-2012 AEMR Figure 2.3 - Coal Ha
- Page 39 and 40:
2011-2012 AEMR January 2009, the wa
- Page 41 and 42:
2011-2012 AEMR Table 2.3 - Stored W
- Page 43 and 44:
2011-2012 AEMR Table 2.4 - WCPL Was
- Page 45 and 46:
2011-2012 AEMR reference creeks for
- Page 47 and 48:
2011-2012 AEMR The purpose of the e
- Page 49 and 50:
SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52:
2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54:
2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56:
2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58:
2011-2012 AEMR Particulate Matter A
- Page 59 and 60:
2011-2012 AEMR Assessment criterion
- Page 61 and 62:
2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64:
2011-2012 AEMR Variations in TSS ob
- Page 65 and 66:
2011-2012 AEMR replacement program
- Page 67 and 68:
2011-2012 AEMR Table 3.2 - Groundwa
- Page 69 and 70:
2011-2012 AEMR Figure 3.13a - Groun
- Page 71 and 72:
2011-2012 AEMR 3.6 Contaminated Lan
- Page 73 and 74:
2011-2012 AEMR prior to undermining
- Page 75 and 76:
SUMP SUMP V10-A2 NORTH WAMBO CREEK
- Page 77 and 78:
2011-2012 AEMR 3.8 Weeds 3.8.1 Envi
- Page 79 and 80:
2011-2012 AEMR WCPL’s development
- Page 81 and 82:
2011-2012 AEMR Day L Aeq(15 minute)
- Page 83 and 84:
2011-2012 AEMR Disturbance (L A1,1m
- Page 85 and 86:
2011-2012 AEMR Stakeholders (WACS)
- Page 87 and 88:
2011-2012 AEMR 3.13.2 European Heri
- Page 89 and 90:
2011-2012 AEMR 3.15 Bushfire Manage
- Page 91 and 92:
2011-2012 AEMR non-sensitive enviro
- Page 93 and 94:
2011-2012 AEMR Table 4.1 - WCPL Emp
- Page 95 and 96:
2011-2012 AEMR 4.3 Community Liaiso
- Page 97 and 98:
2011-2012 AEMR 5.0 Rehabilitation T
- Page 99 and 100:
2011-2012 AEMR 5.1.1.1 Rehabilitati
- Page 101 and 102:
2011-2012 AEMR 5.1.3 NWC Diversion
- Page 103 and 104:
2011-2012 AEMR Riparian EFA Riparia
- Page 105 and 106:
Appendix 1 Rail Haulage Records
- Page 107 and 108:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 109 and 110:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 111 and 112:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 113 and 114:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 115 and 116:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 117 and 118:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 119 and 120:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 121 and 122:
Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 123 and 124: Appendix 2A Meteorological Data
- Page 125 and 126: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 127 and 128: Appendix 2B Air Monitoring Data
- Page 129 and 130: Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 131 and 132: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 133 and 134: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 135 and 136: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 137 and 138: Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 139 and 140: Appendix 2C Surface Water Monitorin
- Page 141 and 142: Annual Environmental Management Rep
- Page 143 and 144: Annual Environmental Management Rep
- Page 145 and 146: Annual Environmental Management Rep
- Page 147 and 148: Annual Environmental Management Rep
- Page 149 and 150: Annual Environmental Management Rep
- Page 151 and 152: Annual Environmental Management Rep
- Page 153 and 154: Annual Environmental Management Rep
- Page 155 and 156: Releases to the Hunter River via th
- Page 157 and 158: Wambo Coal Pty Ltd AEMR 2011‐2012
- Page 159 and 160: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 161 and 162: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 163 and 164: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 165 and 166: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 167 and 168: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 169 and 170: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 171 and 172: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 173: Wambo Coal Pty Ltd AEMR 2011-2012 H
- Page 177 and 178: 2 frequency limits but starts at a
- Page 179 and 180: 4 Figure 2: Channel 1 sensor was mo
- Page 181 and 182: 6 Figure 7: Sensor 1 above the door
- Page 183 and 184: 8 2.2.3 KITCHEN WING Results for th
- Page 185 and 186: Channel 1: Wall adjoining hallway,
- Page 188 and 189: APPENDIX B Waveforms and spectrogra
- Page 190 and 191: North - south ground monitor (“ra
- Page 192 and 193: Wambo Coal Mine Annual Report _____
- Page 194 and 195: EXECUTIVE SUMMARY Global Acoustics
- Page 196 and 197: 1 INTRODUCTION 1.1 Background Globa
- Page 198 and 199: Source: WCNMP, 2007 Figure 1 Monito
- Page 200 and 201: 1.4 Wambo Coal Mine Development Con
- Page 202 and 203: The noise limits identified in Tabl
- Page 204 and 205: 3 RESULTS 3.1 Attended Noise Monito
- Page 206 and 207: 3.1.2 Wambo Coal Rail Spur Noise No
- Page 208 and 209: 3.2 Attended Noise Monitoring - Qua
- Page 210 and 211: 3.2.2 Wambo Coal Rail Spur Noise No
- Page 212 and 213: 3.3 Attended Noise Monitoring - Qua
- Page 214 and 215: 3.3.2 Wambo Coal Rail Spur Noise No
- Page 216 and 217: 3.4 Attended Noise Monitoring - Qua
- Page 218 and 219: 3.4.2 Wambo Coal Rail Spur Noise No
- Page 220 and 221: 4 SUMMARY OF COMPLIANCE 4.1 Summary
- Page 222 and 223: Day Evening/Night Night Land Number
- Page 224 and 225:
A.2 Wambo Rail Spur Development Con
- Page 226 and 227:
compliance with the LAeq(15 minute)
- Page 228 and 229:
Mine noise was audible at both the
- Page 230 and 231:
Our Ref: PR109410:RS/TL 16 December
- Page 232 and 233:
Acacias such as these. Acacias are
- Page 234 and 235:
2011 Annual Ecological Monitoring R
- Page 236 and 237:
Executive Summary RPS Australia Eas
- Page 238 and 239:
Contents EXECUTIVE SUMMARY I 1 INTR
- Page 240 and 241:
Tables Table 2-1:Total Number of Fl
- Page 243 and 244:
1.2 Qualifications and Licensing 1.
- Page 245 and 246:
2.1.1 Limitations of Flora Survey N
- Page 247 and 248:
2.2 Results 2.2.1 Overall Floristic
- Page 249 and 250:
Figure 2-2: Native and Exotic Diver
- Page 251 and 252:
Figure 2-4: Average Native Species
- Page 253 and 254:
• Natural fluctuations in the abu
- Page 255 and 256:
3 Fauna Fauna surveys consisted of
- Page 257 and 258:
Each site was a one hectare (100 m
- Page 259 and 260:
and • two sites have showed a con
- Page 261 and 262:
Species Abundance in 2011 This year
- Page 263 and 264:
(Podargus strigoides), Nankeen Nigh
- Page 265 and 266:
Plate 1. Male Common Bronzewing (Ph
- Page 267 and 268:
Plate 3. Green Tree Frog (Litoria c
- Page 269 and 270:
4 Riparian Monitoring 4.1 Methods R
- Page 271:
WARNING No part of this plan should
- Page 274 and 275:
• A relatively high number of wee
- Page 276 and 277:
Management to control the number an
- Page 278 and 279:
RPS Harper Somer’s O’Sullivan (
- Page 280 and 281:
Table 1: Flora Diversity Within Plo
- Page 282 and 283:
Table 3: Changes in the Number of S
- Page 284 and 285:
Appendix B Flora Quadrat Data 2011
- Page 286 and 287:
Plot: V1-A2 Flora Species Braun Bla
- Page 288 and 289:
Plot: V1-B2 Flora Species Braun Bla
- Page 290 and 291:
Plot: V2 - A1 Flora Species Braun B
- Page 292 and 293:
Plot: V2-B2 Flora Species Braun Bla
- Page 294 and 295:
Plot: V5-B1 Flora Species Braun Bla
- Page 296 and 297:
Plot: V5-B3 Flora Species Braun Bla
- Page 298 and 299:
Plot: V6-A1c Flora Species Braun Bl
- Page 300 and 301:
Plot: V6-B1 Flora Species Braun Bla
- Page 302 and 303:
Plot: V6-B2 Flora Species Braun Bla
- Page 304 and 305:
Plot: V6-B3 Flora Species Braun Bla
- Page 306 and 307:
Plot: V9-A1 Flora Species Braun Bla
- Page 308 and 309:
Plot: V9-B2 Flora Species Braun Bla
- Page 310 and 311:
Plot: V1--A2 Flora Species Braun Bl
- Page 312 and 313:
Plot: V1--B3 Flora Species Braun Bl
- Page 314 and 315:
Plot: V11-B2 Flora Species Braun Bl
- Page 316 and 317:
Plot: V13-B1 Flora Species Braun Bl
- Page 318 and 319:
Plot: V14-B1 Flora Species Braun Bl
- Page 320 and 321:
Appendix C Introduced Flora Species
- Page 322 and 323:
Scientific Name Common Name 2006 20
- Page 324 and 325:
Fauna Species List Family sequencin
- Page 326 and 327:
Family Scientific Name Common Name
- Page 328 and 329:
Family Scientific Name Common Name
- Page 330 and 331:
Site ID: ____________________ Date:
- Page 332 and 333:
Introduced Species (Score) Comments
- Page 334 and 335:
Riparian Microhabitat (Score) Comme
- Page 336 and 337:
Overstorey Understorey Ground Cover
- Page 338 and 339:
Overstorey Understorey Ground Cover
- Page 340 and 341:
Appendix G Riparian Condition Photo
- Page 342 and 343:
Transect Left Bank 1 Upstream 2 Rig
- Page 344 and 345:
Table 5-5: 2011 South Wambo Creek R
- Page 346 and 347:
Transect Left Bank 1 Upstream 2 Rig
- Page 348 and 349:
Transect Left Bank 1 Upstream 2 Rig
- Page 350 and 351:
Transect Left Bank 1 Upstream 2 Rig
- Page 352 and 353:
Transect Left Bank 1 Upstream 2 Rig
- Page 354 and 355:
Transect Left Bank 1 Upstream 2 Rig
- Page 356 and 357:
Curriculum Vitae TOBY LAMBERT Princ
- Page 358 and 359:
Curriculum Vitae PAUL HILLIER Senio
- Page 360 and 361:
Curriculum Vitae - CONTINUED - •
- Page 362 and 363:
Curriculum Vitae - CONTINUED - Ph.D
- Page 364 and 365:
Wambo Coal Pty Limited AEMR 2011-20
- Page 366 and 367:
Wambo Coal Pty Limited AEMR 2011-20
- Page 368 and 369:
Appendix 4 Register of Community Co
- Page 370 and 371:
Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 372 and 373:
Number Date (d/m/yr) Complainant ID
- Page 374 and 375:
Wambo Coal Pty Ltd AEMR 2011-2012 p
- Page 376 and 377:
Number Date (d/m/yr) Complainant ID
- Page 378 and 379:
Number Date (d/m/yr) Complain ant I
- Page 380:
Appendix 6 Environmental Audit Resp