2011-2012 AEMR Table 1.0 – Annual Review Reporting Requirements cont. Annual Review Reporting Requirements Schedule 4 - DA 177-8-2004 Operating Conditions 15. The Applicant shall: (a) ensure any visible air pollution generated by the development is assessed regularly, and that operations are modified, and/or stopped as required to minimise air quality impacts on privately owned land; (b) implement all practicable measures to minimise air pollutant emissions from the development; and (c) report on the effectiveness of these measures in the AEMR, to the satisfaction of the Director-General. Monitoring of Coal Transport 18. The Applicant shall: (a) keep records of the: amount of coal loaded at the development each year; and number of coal haulage train movements generated by the development (on a daily basis); and (b) include these records in the AEMR. Schedule 6 - DA 177-8-2004 Annual Reporting 4. Within 1 year of the date of this consent, and annually thereafter, the Applicant shall submit an AEMR on the development to the Director-General and relevant agencies. This report must: (a) identify the standards and performance measures that apply to the development; (b) include a summary of the complaints received during the last year, and compare this to the complaints received in previous years; (c) include a summary of the monitoring results on the development during the last year; (d) include an accurate record of the amount of product coal transported on the development over the last year on a weekly basis; (e) include an analysis of these monitoring results against the relevant: impact assessment criteria; monitoring results from previous years; and predictions in the SEE; (f) identify any trends in the monitoring over the life of the development; (g) identify any non-compliance during the last year; and, if necessary, (h) describe what actions were, or are being taken, to ensure compliance. SMP Approval LW1-6 A summary of results of the monitoring programmes discussed in Section 6 will be reported in the Annual Environmental Management Report (AEMR). Any remediation works undertaken will also be reported in the AEMR. Members of the Wambo CCC receive a copy of the AEMR. EPBC 2003/1138 Section Section 3.0 Appendix 1 Section 2.5 Section This Document Section 3.0 Section 4.0 Section 3.0 Appendix 1 & Section 2.5 Section 3.0 Section Section 1.3.7 Section 3.16 Section 3(d) a process to review and report annually on this plan 1 . Section 3.7 1 WCMP have prepared to the satisfaction of the Minster for Department of Sustainability, Environment, Water, Population and Communities a Flora and Fauna Management Plan Page 4
SUMP SUMP N NEW Muswellbrook LOCALITY PLAN HIGHWAY ENGLAND Singleton HIGHWAY PACIFIC Maitland WAMBO MINE Broke NEWCASTLE Morriset SYDNEY - NEWCASTLE FREEWAY NEWCASTLE - SYDNEY (150km) SYDNEY JERRYS PLAINS 15km COAL & ALLIED RIVERVIEW PIT GOLDEN HIGHWAY WAMBO OPEN CUT UNITED COLLIERY NORTH WAMBO CREEK DIVERSION WARKWORTH VILLAGE WAMBO RAIL LOADOUT STAGE 3 CREEK DIVERSION WAMBO CHPP NORTH WAMBO UNDERGROUND WAMBO ADMIN SINGLETON 20km NORTH WAMBO CREEK BROOK WOLLOMBI STONY SOUTH WAMBO CREEK CREEK Legend Colliery Holding Boundary DA Approved Open Cut Limits MOP Open Cut Limits Wambo Owned Land Open Cut Mining at 30th June 2012 North Wambo Underground Workings (Existing) North Wambo Underground Workings (Proposed) Prepared by Pegasus Technical CAD FILE: 08667A WAMBO COAL SITE LOCATION PLAN FIGURE 1.1
- Page 1 and 2: Wambo Coal Pty Limited ANNUAL ENVIR
- Page 3 and 4: Name of Mine: Titles/Mining Lease:
- Page 5 and 6: 2011-2012 AEMR 2.8 Water Management
- Page 7 and 8: 2011-2012 AEMR 3.13.1 Aboriginal He
- Page 9 and 10: 2011-2012 AEMR List of Figures Figu
- Page 11 and 12: 2011-2012 AEMR List of Appendices A
- Page 13 and 14: 2011-2012 AEMR 1.0 Introduction 1.1
- Page 15: 2011-2012 AEMR Table 1.0 - Annual R
- Page 19 and 20: 2011-2012 AEMR Table 1.2 - WCPL Min
- Page 21 and 22: 2011-2012 AEMR 1.3.3 Environmental
- Page 23 and 24: SUMP SUMP 5 UNITED COLLIERY GOLDEN
- Page 25 and 26: 2010-2011 AEMR 1.3.7 Subsidence Man
- Page 27 and 28: 2010-2011 AEMR 1.5 Review of 2011-2
- Page 29 and 30: 2010-2011 AEMR No DP&I Issue DP&I A
- Page 31 and 32: 2011-2012 AEMR Figure 2.2 - Vegetat
- Page 33 and 34: 2011-2012 AEMR Table 2.1 - Producti
- Page 35 and 36: 2011-2012 AEMR The exposed coal is
- Page 37 and 38: 2011-2012 AEMR Figure 2.3 - Coal Ha
- Page 39 and 40: 2011-2012 AEMR January 2009, the wa
- Page 41 and 42: 2011-2012 AEMR Table 2.3 - Stored W
- Page 43 and 44: 2011-2012 AEMR Table 2.4 - WCPL Was
- Page 45 and 46: 2011-2012 AEMR reference creeks for
- Page 47 and 48: 2011-2012 AEMR The purpose of the e
- Page 49 and 50: SUMP SUMP N19 SW46 SW45 Hunter Rive
- Page 51 and 52: 2011-2012 AEMR Figure 3.4 - 2010-20
- Page 53 and 54: 2011-2012 AEMR 3.2.1.2 Penalty Infr
- Page 55 and 56: 2011-2012 AEMR 3.2.2.3 PM 10 Four r
- Page 57 and 58: 2011-2012 AEMR Particulate Matter A
- Page 59 and 60: 2011-2012 AEMR Assessment criterion
- Page 61 and 62: 2011-2012 AEMR 3.4 Surface Water 3.
- Page 63 and 64: 2011-2012 AEMR Variations in TSS ob
- Page 65 and 66: 2011-2012 AEMR replacement program
SUMP<br />
SUMP<br />
N<br />
NEW<br />
Muswellbrook<br />
LOCALITY PLAN<br />
HIGHWAY<br />
ENGLAND<br />
Singleton<br />
HIGHWAY<br />
PACIFIC<br />
Maitland<br />
WAMBO<br />
MINE<br />
Broke<br />
NEWCASTLE<br />
Morriset<br />
SYDNEY -<br />
NEWCASTLE<br />
FREEWAY<br />
NEWCASTLE -<br />
SYDNEY (150km)<br />
SYDNEY<br />
JERRYS PLAINS 15km<br />
COAL & ALLIED<br />
RIVERVIEW PIT<br />
GOLDEN<br />
HIGHWAY<br />
WAMBO OPEN CUT<br />
UNITED COLLIERY<br />
NORTH WAMBO<br />
CREEK DIVERSION<br />
WARKWORTH<br />
VILLAGE<br />
WAMBO RAIL<br />
LOADOUT<br />
STAGE 3 CREEK<br />
DIVERSION<br />
WAMBO CHPP<br />
NORTH WAMBO<br />
UNDERGROUND<br />
WAMBO ADMIN<br />
SINGLETON<br />
20km<br />
NORTH<br />
WAMBO CREEK<br />
BROOK<br />
WOLLOMBI<br />
STONY<br />
SOUTH<br />
WAMBO<br />
CREEK<br />
CREEK<br />
Legend<br />
Colliery Holding Boundary<br />
DA Approved Open Cut Limits<br />
MOP Open Cut Limits<br />
<strong>Wambo</strong> Owned Land<br />
Open Cut Mining at 30th June <strong>2012</strong><br />
North <strong>Wambo</strong> Underground Workings (Existing)<br />
North <strong>Wambo</strong> Underground Workings (Proposed)<br />
Prepared by Pegasus Technical CAD FILE: 08667A<br />
WAMBO COAL<br />
SITE LOCATION PLAN<br />
FIGURE 1.1