01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

Table 1.0 – Annual Review Reporting Requirements<br />

Annual Review Reporting Requirements<br />

Schedule 4 - DA 305-7-2003<br />

Site Water Balance<br />

25. Each year, the Applicant shall:<br />

(a) review the site water balance for the development against the predictions in the EIS;<br />

(b) re-calculate the site water balance for the development;<br />

(c) assess current and forecast compliance with the rules of the Hunter River Salinity Trading<br />

Scheme; and<br />

(d) report the results in the Annual Review.<br />

Monitoring<br />

79. The Applicant shall:<br />

(a) keep records of the<br />

amount of coal transported from the site each year; and<br />

number of coal haulage truck movements generated each day by the development; and<br />

(b) include these records in the Annual Review.<br />

Greenhouse Gas<br />

87. For the life of the development, the Applicant shall:<br />

(a) monitor the greenhouse emissions generated by the development;<br />

(b) investigate ways to reduce greenhouse emissions generated by the development; and<br />

(c) report on greenhouse gas monitoring and abatement measures in the Annual Review, to<br />

the satisfaction of the Director-General<br />

Waste Minimisation<br />

88. For the life of the development, the Applicant shall:<br />

(a) monitor the amount of waste generated by the development;<br />

(b) investigate ways to minimise waste generated by the development;<br />

(c) implement reasonable and feasible measures to minimise waste generated by the<br />

development; and<br />

(d) report on waste management and minimisation in the Annual Review, to the satisfaction of<br />

the Director-General.<br />

Schedule 6 - DA 305-7-2003<br />

Annual Review<br />

5. The Applicant shall submit an annual review of the environmental performance of the<br />

development to the satisfaction of the Director-General. This review must:<br />

(a) describe the development (including any rehabilitation) that was carried out in the past<br />

year, and the development that is proposed to be carried out over the next year;<br />

(b) include a comprehensive review of the monitoring results and complaints records of the<br />

development over the past year, which includes a comparison of these results against:<br />

the relevant statutory requirements, limits or performance measures/criteria;<br />

the monitoring results of previous years; and<br />

the relevant predictions in the EIS;<br />

(c) identify any non-compliance over the past year, and describe what actions were (or are<br />

being) taken to ensure compliance;<br />

(d) identify any trends in the monitoring data over the life of the development;<br />

(e) identify any discrepancies between the predicted and actual impacts of the development,<br />

and analyse the potential cause of any significant discrepancies; and<br />

(f) describe what measures will be implemented<br />

Note: Violet represents January 2007 Modification<br />

Brown represents June 2009 Modification<br />

Blue represents February <strong>2011</strong> Modification<br />

Section<br />

Section 2.8.2.1<br />

Section 2.8.3<br />

Appendix 1<br />

Section 2.5<br />

Section 3.18.1<br />

Section 2.6<br />

Section<br />

This Document<br />

Section 2.0<br />

Section 5.1<br />

Section 3.0<br />

Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!