01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annual Environmental Management Report <strong>2011</strong>-<strong>2012</strong><br />

SW47 - NWU Pumpout<br />

SW49 - Bates Pit Pump<br />

SW48 - Inpit Water<br />

Month<br />

water<br />

out<br />

SW51 - South Dam<br />

pH EC (uS/cm) pH EC (uS/cm) pH EC (uS/cm) pH EC (uS/cm)<br />

Jul-11 8.80 9,180 8.40 6,180 8.30 3,180 8.9 7730<br />

Aug-11 8.80 8,780 7.90 7,330 8.50 1,478 8.9 7540<br />

Sep-11 9.00 6,530 8.50 6,800 8.20 1,150 9.1 7350<br />

Oct-11 9.50 6,780 8.60 6,150 8.60 1261.00 9.1 6400<br />

Nov-11 8.60 5,900 7.30 3,170 9 6920<br />

Dec-11 8.50 3,800 6.80 712 9 6480<br />

Jan-12 8.20 5,750 8.60 914 8.8 6530<br />

Feb-12 8.50 3,950 8.30 807 8.9 6780<br />

Mar-12 7.50 5,240 8.70 738 9 7260<br />

Apr-12 8.60 7,030 8.70 813 9.1 7,430<br />

May-12 8.70 6,670 8.70 649 9 6,760<br />

Jun-12 8.70 6,830 8.70 813 9.00 6,160<br />

Average 9.03 7,818 8.39 5,969 8.28 1,307 8.98 6,945<br />

Appendix 2C: Surface Water Monitoring Results (Mine Water)<br />

Blank cells indicate that no sample was collected due to the site being dry, inaccessible or not due for collection<br />

Bolded/shaded cells indicate results outside recommended criteria

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!