Wambo Coal AEMR 2011-2012 - Peabody Energy
Wambo Coal AEMR 2011-2012 - Peabody Energy Wambo Coal AEMR 2011-2012 - Peabody Energy
Annual Environmental Management Report 2011-2012 Monthly Surface Water Monitoring Mine Water Dams SW30 - Turkeys Nest Dam SW31 - GBF Dam SW38 - Homestead Open Cut SW47 - NWU Pumpout SW48 - Homestead Pit Inflow SW49 - Bates Pit Pump Out Monthly Surface Water Monitoring Mine Water Dams SW30 - Turkeys Nest Dam SW31 - GBF Dam SW38 - Homestead Open Cut SW47 - NWU Pumput SW48 - Homestead Pit Inflow SW49 - Bates Pit Pump Out pH 10.0 9.0 8.0 7.0 6.0 5.0 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Month Feb-12 Mar-12 Apr-12 May-12 Jun-12 Electrical Conductivity (uS/cm) 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Month Feb-12 Mar-12 Apr-12 May-12 Jun-12 Monthly Surface Water Monitoring Mine Water Dams Monthly Surface Water Monitoring Mine Water Dams SW13 - Area C Dam SW14 - Admin Dam SW13 - Area C Dam SW14 - Admin Dam pH 10.0 9.0 8.0 7.0 6.0 5.0 Jul-11 Aug-11 Sep-11 SW29 - SCB Dam Oct-11 Nov-11 Dec-11 Jan-12 Month SW37 - Wollemi Sump Feb-12 Mar-12 Apr-12 May-12 Jun-12 Electrical Conductivity (uS/cm) 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 Jul-11 Aug-11 Sep-11 SW29 - SCB Dam Oct-11 Nov-11 Dec-11 Jan-12 Month SW37 - Wollemi Sump Feb-12 Mar-12 Apr-12 May-12 Jun-12 Appendix 2C: Surface Water Monitoring Results (Mine Water) Blank in graph indicates that no sample was collected
Annual Environmental Management Report 2011-2012 Monthly Surface Water Monitoring Mine Water Dams Monthly Surface Water Monitoring Mine Water Dams 10.0 9.0 8.0 7.0 6.0 5.0 SW15 - Eagles Nest Dam Monthly Surface Water Monitoring Mine Water Dams Monthly Surface Water Monitoring Mine Water Dams SW15 Eagles Nest Dam 80 70 60 50 40 30 20 10 0 6,000 5,000 4,000 3,000 2,000 1,000 0 SW15 - Eagles Nest Dam Total Suspended Solids (mg/L) Mar-12 Apr-12 May-12 Jun-12 Total Dissolved Solids (mg/L) Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 pH Month 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 SW15 - Eagles Nest Dam Electrical Conductivity (uS/cm) Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Month Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Month Month Appendix 2C: Surface Water Monitoring Results (Mine Water) Blank in graph indicates that no sample was collected
- Page 91 and 92: 2011-2012 AEMR non-sensitive enviro
- Page 93 and 94: 2011-2012 AEMR Table 4.1 - WCPL Emp
- Page 95 and 96: 2011-2012 AEMR 4.3 Community Liaiso
- Page 97 and 98: 2011-2012 AEMR 5.0 Rehabilitation T
- Page 99 and 100: 2011-2012 AEMR 5.1.1.1 Rehabilitati
- Page 101 and 102: 2011-2012 AEMR 5.1.3 NWC Diversion
- Page 103 and 104: 2011-2012 AEMR Riparian EFA Riparia
- Page 105 and 106: Appendix 1 Rail Haulage Records
- Page 107 and 108: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 109 and 110: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 111 and 112: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 113 and 114: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 115 and 116: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 117 and 118: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 119 and 120: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 121 and 122: Wambo Coal Pty Ltd AEMR 2011-2012 R
- Page 123 and 124: Appendix 2A Meteorological Data
- Page 125 and 126: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 127 and 128: Appendix 2B Air Monitoring Data
- Page 129 and 130: Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 131 and 132: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 133 and 134: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 135 and 136: Wambo Coal Pty Ltd AEMR 2011-2012 W
- Page 137 and 138: Wambo Coal Pty Ltd AEMR 2011-2012 D
- Page 139 and 140: Appendix 2C Surface Water Monitorin
- Page 141: Annual Environmental Management Rep
- Page 145 and 146: Annual Environmental Management Rep
- Page 147 and 148: Annual Environmental Management Rep
- Page 149 and 150: Annual Environmental Management Rep
- Page 151 and 152: Annual Environmental Management Rep
- Page 153 and 154: Annual Environmental Management Rep
- Page 155 and 156: Releases to the Hunter River via th
- Page 157 and 158: Wambo Coal Pty Ltd AEMR 2011‐2012
- Page 159 and 160: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 161 and 162: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 163 and 164: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 165 and 166: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 167 and 168: Wambo Coal Pty Ltd AEMR 2011-2012 M
- Page 169 and 170: Wambo Coal Pty Ltd AEMR 2011-2012 G
- Page 171 and 172: Wambo Coal Pty Ltd AEMR 2011-2012 P
- Page 173 and 174: Wambo Coal Pty Ltd AEMR 2011-2012 H
- Page 176 and 177: WAMBO HOMESTEAD 1 B L A S T V I B R
- Page 178 and 179: • individual wall panels — 20 H
- Page 180 and 181: 5 Figure 5: Setup for recording in
- Page 182 and 183: • spectrograms were constructed u
- Page 184 and 185: APPENDIX A Waveforms and spectrogra
- Page 186: East - west ground monitor (“tran
- Page 189 and 190: Channel 1: Channel 2: Channel 3:
- Page 191 and 192: Appendix 2F Noise Monitoring Result
Annual Environmental Management Report <strong>2011</strong>-<strong>2012</strong><br />
Monthly Surface Water Monitoring<br />
Mine Water Dams<br />
SW30 - Turkeys Nest Dam SW31 - GBF Dam SW38 - Homestead Open Cut<br />
SW47 - NWU Pumpout SW48 - Homestead Pit Inflow SW49 - Bates Pit Pump Out<br />
Monthly Surface Water Monitoring<br />
Mine Water Dams<br />
SW30 - Turkeys Nest Dam SW31 - GBF Dam SW38 - Homestead Open Cut<br />
SW47 - NWU Pumput SW48 - Homestead Pit Inflow SW49 - Bates Pit Pump Out<br />
pH<br />
10.0<br />
9.0<br />
8.0<br />
7.0<br />
6.0<br />
5.0<br />
Jul-11<br />
Aug-11<br />
Sep-11<br />
Oct-11<br />
Nov-11<br />
Dec-11<br />
Jan-12<br />
Month<br />
Feb-12<br />
Mar-12<br />
Apr-12<br />
May-12<br />
Jun-12<br />
Electrical Conductivity (uS/cm)<br />
10,000<br />
9,000<br />
8,000<br />
7,000<br />
6,000<br />
5,000<br />
4,000<br />
3,000<br />
2,000<br />
1,000<br />
0<br />
Jul-11<br />
Aug-11<br />
Sep-11<br />
Oct-11<br />
Nov-11<br />
Dec-11<br />
Jan-12<br />
Month<br />
Feb-12<br />
Mar-12<br />
Apr-12<br />
May-12<br />
Jun-12<br />
Monthly Surface Water Monitoring<br />
Mine Water Dams<br />
Monthly Surface Water Monitoring<br />
Mine Water Dams<br />
SW13 - Area C Dam<br />
SW14 - Admin Dam<br />
SW13 - Area C Dam<br />
SW14 - Admin Dam<br />
pH<br />
10.0<br />
9.0<br />
8.0<br />
7.0<br />
6.0<br />
5.0<br />
Jul-11<br />
Aug-11<br />
Sep-11<br />
SW29 - SCB Dam<br />
Oct-11<br />
Nov-11<br />
Dec-11<br />
Jan-12<br />
Month<br />
SW37 - Wollemi Sump<br />
Feb-12<br />
Mar-12<br />
Apr-12<br />
May-12<br />
Jun-12<br />
Electrical Conductivity (uS/cm)<br />
8,000<br />
7,000<br />
6,000<br />
5,000<br />
4,000<br />
3,000<br />
2,000<br />
1,000<br />
0<br />
Jul-11<br />
Aug-11<br />
Sep-11<br />
SW29 - SCB Dam<br />
Oct-11<br />
Nov-11<br />
Dec-11<br />
Jan-12<br />
Month<br />
SW37 - Wollemi Sump<br />
Feb-12<br />
Mar-12<br />
Apr-12<br />
May-12<br />
Jun-12<br />
Appendix 2C: Surface Water Monitoring Results (Mine Water)<br />
Blank in graph indicates that no sample was collected