<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

1.3 Consents, Leases and<br />

Licences<br />

1.3.1 Development Consents<br />

Mining and rail activities at WCPL operate under<br />

various development consents granted by the NSW<br />

Department of Planning & Infrastructure (DP&I),<br />

formally the Department of Planning (DoP), and<br />

SSC. The continued development of open cut and<br />

underground mining activities commenced under<br />

DA 305-7-2003 in November 2004. The construction<br />

of the rail spur, rail loop and train loadout area<br />

commenced under DA 177-8-2004 in January 2005.<br />

Table 1.0 outlines the annual reporting<br />

requirements from DA305-7-2003 and DA177-8-<br />

2004 and where the requirement is addressed in the<br />

<strong>AEMR</strong>. Table 1.1 provides a historical summary of<br />

development approvals and active development<br />

consents applicable to WCPL.<br />

During April <strong>2011</strong>, an application to modify DA177-<br />

8-2004 in accordance with Section 75(W) of the<br />

EP&A Act was lodged by WCPL for the<br />

establishment of a small locomotive refuelling<br />

station adjacent to the WCPL rail loadout facility. At<br />

the time of preparing the 2010-<strong>2011</strong> <strong>AEMR</strong>, no<br />

decision had been made by the DP&I regarding this<br />

modification. On 17 February <strong>2012</strong> an approval was<br />

granted for the refueling facility.<br />

All other development consents, except DA 108/91<br />

granted by SSC, were surrendered by WCPL in<br />

November 2005.<br />

1.3.2 Mining Leases and<br />

Authorisations<br />

WCPL’s current mining leases and authorisations<br />

are listed below in Table 1.2 and shown in Figure<br />

1.2<br />