<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

EXCUTIVE SUMMARY<br />

<strong>Wambo</strong> <strong>Coal</strong> Pty Limited (WCPL) continued to operate in accordance with its Mining Operations Plans (MOP),<br />

Development Consents, Environmental Protection Licence (EPL) and all other approvals during the <strong>2011</strong>-<strong>2012</strong><br />

reporting period.<br />

WCPL reported four notifiable environmental incidents during the reporting period in relation to blasting, dam<br />

overflow, dam seepage and elevated dust results.<br />

All environmental monitoring undertaken during the reporting period was in accordance with DA 305-7-2003, DA<br />

17-8-2004, Environmental Protection Licence (EPL) No.529 and approved management plans.<br />

WCPL completed no final rehabilitation in the open cut during the reporting period, however approximately 40ha of<br />

final landform at RL160 was completed and in readiness for topsoil application and seeding early in the next<br />

reporting period. Remedial rehabilitation works of North East Tailings Dam (NETD) continued, during the reporting<br />

period. Construction of Stage 3 of the North <strong>Wambo</strong> Creek Diversion was nearing completion at the end of the<br />

reporting period.<br />

The WCPL Open Cut moved a total of 34,223,764 bank cubic metres (bcm) of prime overburden to allow the<br />

extraction of 3.949 million tonnes (Mt) of run of mine (ROM) coal during <strong>2011</strong>-<strong>2012</strong>.<br />

The WCPL Underground operation extracted a total 4.797 Mt of ROM coal during the <strong>2011</strong>-<strong>2012</strong> reporting period.<br />

A total of 5.698 Mt of product coal was produced by WCPL during the <strong>2011</strong>-<strong>2012</strong> reporting period.<br />

All coal produced from WCPL was railed via the WCPL rail spur and rail line to the Port of Newcastle for export.<br />

There was no change in production methods during this reporting period.<br />

At the current rates of production and assuming no further mining approvals, the Open Cut and Underground mine<br />

has a remaining life of approximately 5 years and 4 years respectively.<br />

WCPL received a total of eighty two community complaints during the reporting period.<br />