01.11.2014 Views

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

Wambo Coal AEMR 2011-2012 - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2011</strong>-<strong>2012</strong> <strong>AEMR</strong><br />

After pumping 31 July <strong>2011</strong><br />

NETD Rehabilitation Status as of December <strong>2011</strong><br />

NETD at the end of June <strong>2012</strong><br />

NETD Rehabilitation Status as of June <strong>2012</strong><br />

At the end of the reporting period approximately<br />

56% of the dam surface is covered with a layer of<br />

rejects. The target is to complete rejects placement<br />

on 100% of the dam by the end of <strong>2012</strong>.<br />

5.1.2 Rail Line<br />

NETD Rehabilitation Status as of July <strong>2011</strong><br />

Rehabilitation was progressively completed on the<br />

<strong>Wambo</strong> Rail Development (WRD) following the<br />

completion of construction activities. The primary<br />

aims of this rehabilitation was to allow the<br />

regeneration of native flora species on the site,<br />

maintain the structural stability of the land, prevent<br />

erosion and sedimentation, and provide natural<br />

screening, where possible, to maintain the visual<br />

amenity of the WRD.<br />

Continued monitoring of the rehabilitation and tree<br />

maintenance works will continue throughout <strong>2011</strong>-<br />

<strong>2012</strong> reporting period.<br />

Page 88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!