2012 Budget - South Suburban Parks and Recreation
2012 Budget - South Suburban Parks and Recreation
2012 Budget - South Suburban Parks and Recreation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>South</strong> <strong>Suburban</strong> Park <strong>and</strong> <strong>Recreation</strong> District<br />
Capital Improvement Plan<br />
Project Highlights for <strong>2012</strong> (continued)<br />
3. Outdoor Pool Improvements at Franklin <strong>and</strong> Harlow Pools (estimated cost of<br />
$87,500). Project will include concrete pool deck repairs ($2,500 at Franklin <strong>and</strong><br />
$5,000 at Harlow) <strong>and</strong> pool replastering ($10,000 for Franklin Wading Pool <strong>and</strong><br />
$70,000 for Harlow Main Pool).<br />
4. Family Sports Center Interior Painting Phase I (estimated cost of $67,000). The<br />
District took over the Family Sports Center in 2001. Since that time the building has<br />
not been painted <strong>and</strong> is looking rundown in some areas. Phase I will include highly<br />
visible public areas of the facility.<br />
5. Redrill Well #1 at <strong>South</strong> <strong>Suburban</strong> Golf Course (estimated cost of $400,000). The<br />
<strong>South</strong> <strong>Suburban</strong> Golf Course is irrigated with well water. Well #1 is in need of<br />
redrilling to continue to effectively maintain the golf course turf.<br />
6. <strong>South</strong> <strong>Suburban</strong> Golf Course Clubhouse Improvements Phase I (estimated cost of<br />
$175,000). <strong>South</strong> <strong>Suburban</strong> Golf Course clubhouse has become dated <strong>and</strong> does not<br />
have the most effective set up for the large number of people who go through the<br />
facility. Staff is recommending improvements to the restaurant, pro shop, <strong>and</strong><br />
bathrooms. Total cost for these improvements has an estimated range of $259,000 to<br />
$353,500. The Board of Directors approved Phase I improvements of $175,000 in the<br />
<strong>2012</strong> <strong>Budget</strong>. Citizen’s comments will be taken into consideration with regard to the<br />
priority of the improvements.<br />
7. <strong>South</strong> <strong>Suburban</strong> Golf Course Halfway House Improvements (estimated cost of<br />
$100,000). The restroom facility (halfway house) on the golf course is in need of<br />
major repair. One of the two stalls was closed this season due to a rotted out floor.<br />
The District plans to use in house crews to repair <strong>and</strong> improve the halfway house.<br />
8. Lone Tree Golf Course Clubhouse improvements (estimated cost of $50,000). The<br />
exterior of the Lone Tree Clubhouse is in need of repairs. This project includes repair<br />
to siding <strong>and</strong> painting, as well as, repair to the railings on the hotel deck areas.<br />
The District’s capital expenditures for <strong>2012</strong> include $1,145,000 for anticipated grant projects.<br />
Great Outdoor Colorado grants are for $400,000 (two $200,000 grants), with matching funds<br />
from the District of $120,000. Arapahoe County Open Space grants are for $500,000 (two<br />
$250,000 grants), with matching funds from the District of $125,000. Applications for these<br />
grants are typically due in March. The are several projects under consideration at this time,<br />
including open space acquisitions, new trail development or existing trail enhancements.<br />
Actual projects submitted will be finalized in early <strong>2012</strong>. If the grant funds are not awarded<br />
to the District by the granting agencies, the District will not spend the pledged matching<br />
funds. They will return to contingency or undesignated funds for reappropriation.<br />
73