2012 Budget - South Suburban Parks and Recreation
2012 Budget - South Suburban Parks and Recreation
2012 Budget - South Suburban Parks and Recreation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>South</strong> <strong>Suburban</strong> Park <strong>and</strong> <strong>Recreation</strong> District<br />
Capital Request<br />
<strong>2012</strong>-2016<br />
<strong>2012</strong> <strong>Budget</strong> 2013 2014 2015 2016<br />
Colorado Journey Lost Horse Feature (hole 8, Conestoga) 82,500<br />
Colorado Journey Marble Quarry (hole 2, Pack Mule) 7,500<br />
Colorado Journey Narrow Gauge Railroad (hole 13,<br />
Conestoga) 40,000<br />
Colorado Journey TiPi replacement (hole 18, Pack Mule) 3,500<br />
Colorado Journey Wagon replacement (hole 18,<br />
Conestoga) 5,000<br />
Subtotals, Family Sports Center - 56,000 45,000 82,500 65,000<br />
Carson Nature Center<br />
Replace interior carpeting 3,000<br />
Restore interior hardwood finish 3,000<br />
Install fire alarm system in historic building 5,800<br />
Nature Programs Laptop <strong>and</strong> projector replacement 2,000<br />
Refinish river room epoxy floor 2,500<br />
Replace canoe equipment, 2 boats, safety gear, paddles 2,500<br />
Subtotals, Carson Nature Center - 8,800 - 7,500 2,500<br />
Holly Park Pool<br />
Holly Pool <strong>and</strong> Tennis Impr (matched with Centennial 414,333 -<br />
Install speed slide $//<br />
Locker room renovations $///<br />
Pool deck furniture $//<br />
Pump room renovations $///<br />
Replace lifeguard st<strong>and</strong>s $//<br />
Replace/repair pool infrastructure $///<br />
Replace/Resurface diving board $//<br />
Sound system $//<br />
Subtotals, Holly Park Pool 414,333 - - - -<br />
Harlow Park Pool<br />
Repair concrete deck 5,000<br />
Replaster Main Pool 70,000<br />
Shade Structure 5,000<br />
Subtotals, Harlow Park Pool 75,000 5,000 - - -<br />
Franklin Pool<br />
Repair concrete deck 2,500<br />
Replaster Wading Pool 10,000<br />
Subtotals, Harlow Park Pool 12,500 - - - -<br />
Littleton Tennis<br />
Littleton Tennis Indoor Carpet 8,000<br />
Subtotals, Littleton Tennis - - 8,000 - -<br />
BMX<br />
Shelter for BMX track area (24 feet x 24 feet) 25,000<br />
Subtotals, BMX - 25,000 - - -<br />
Total, Other <strong>Recreation</strong> Facilities 501,833 119,800 53,000 90,000 67,500<br />
Totals, <strong>Recreation</strong>, Programs <strong>and</strong> Facilities 1,379,833 2,873,876 583,000 345,000 199,500<br />
Planning <strong>and</strong> Construction<br />
ACOS Grant Match 125,000 125,000 125,000 125,000<br />
Community Development Block Grants Match (No match<br />
required, but helps with scoring) 15,000 15,000 15,000 15,000<br />
Cornerstone Park Large Rentable Picnic Shelter by the<br />
Sprayground 75,000<br />
294