30.10.2014 Views

2012 Budget - South Suburban Parks and Recreation

2012 Budget - South Suburban Parks and Recreation

2012 Budget - South Suburban Parks and Recreation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>South</strong> <strong>Suburban</strong> Park <strong>and</strong> <strong>Recreation</strong> District<br />

Capital Request<br />

<strong>2012</strong>-2016<br />

<strong>2012</strong> <strong>Budget</strong> 2013 2014 2015 2016<br />

Replace Washing Machine 75 lb (1996) 13,000<br />

Replace Window Treatments Lounge & DR (1996) 30,000<br />

Replace Windows 15,000 15,000 15,000 15,000<br />

Shop addition 85,000<br />

Tree replacements 10,000 10,000 10,000 10,000<br />

Tunnel deck replacement 20,000<br />

Well re-hab 30,000<br />

Equipment<br />

Fairway spiker 9,500<br />

Beverage cart (Cushman heavy duty) 18,000<br />

Carry All utility carts 17,000 17,000 17,000 17,000<br />

Fairway aerator 25,000<br />

Fairway mowers 65,000<br />

Golf Cars 225,000<br />

Greens aerator 25,000<br />

Greens mower trailers 4,000 4,000<br />

Pickup (Supt. Of courses) 25,000<br />

Rough Mower 55,000<br />

S<strong>and</strong> rake 20,000<br />

Skid steer loader 35,000<br />

Sprayer 30,000<br />

Tri plex mower 35,000 30,000<br />

Trim mower 35,000<br />

Walking greens mowers 30,000<br />

Workman utility vehicle 15,000 15,000 25,000<br />

Z-Mower 12,000<br />

Subtotals, Lone Tree Golf Club & Hotel 214,500 962,100 360,500 192,500 391,300<br />

<strong>South</strong> <strong>Suburban</strong> Golf Course<br />

#12 Bunker work 25,000<br />

#15 fairway bunker work 10,000 10,000 10,000 10,000<br />

#3 Bunker work 20,000<br />

#7 walk bridge 25,000<br />

Bar Stools 3,600<br />

Cart paths #14 #6 15,000<br />

Equipment storage 65,000<br />

Fence replacement 8,000 8,000<br />

Halfway house rest rooms 100,000<br />

Par 3 bunker work 25,000<br />

Par 3 irrigation 200,000<br />

Par 3 Bridges 92,792<br />

Parking lot re-seal 15,000<br />

Purchase convection oven (new) 7,000<br />

Putting green re-do <strong>and</strong> addition 25,000<br />

Replace Bar, include sinks, speed bar, new keg cooler, etc. 33,000<br />

Replace Clubhouse Awning (2004) 10,000<br />

Replace Clubhouse Carpet (1996) 33,000<br />

Replace deep fryer (1995) 12,000<br />

Replace Dining room furniture after carpet & bar (2000) 28,000<br />

Replace Drink Cart (2002) 20,000<br />

Replace Flat top grill with oven (1990) 12,000<br />

Replace four door freezer (1985) 15,000<br />

287

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!