28.10.2014 Views

BORDER ROADS ORGANISATION

BORDER ROADS ORGANISATION

BORDER ROADS ORGANISATION

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CA NO: CDR/760TF/ / 2012-13 Ser Page No: 64<br />

SYSTEM INSTALLED IN JAWAHAR TUNNEL<br />

1. CCTC System Nos Appx Value<br />

(a) Pan tilt & Zoom (PTZ) camera Nos 13<br />

(b) Fixed cameras in corset out Nos 05<br />

( c) Dvr (Digital Video Recorder) Nos 01<br />

(d) PTZ Controller Nos 02<br />

(e) Display monitor Nos 19<br />

2 Control System<br />

(a) Master Control Pave-I Nos 01<br />

(b) Slave Control Pave 1 (DGP) Nos 04<br />

© Graphics command centre with software Nos 01<br />

(d) Type of sensor<br />

(i) CO (Carbon monoxide) Nos 06<br />

(ii)Smoke sensor Nos 6+1<br />

(iii)Visibility Nos 06<br />

(iv)Temperature sensor Nos 6+1<br />

(v)Wind speed Nos 2<br />

(vi)Wind direction Nos 02<br />

(vii) Fan direction Nos 84<br />

(viii)Lux sensor Nos 02<br />

(e)<br />

(ix)Interfaces Nos 116<br />

PA System<br />

(i)Speakers Nos 31<br />

(ii)Telephones Nos 44<br />

(iii)Control ZAM for speakers Nos 06<br />

(iv)Amplifiers (400w) Nos 02<br />

3 Venitilation System<br />

(a) Jet Fans Nos 44<br />

(b) Soft Starter Nos 42<br />

4. Electrical system<br />

(a) Transformers Nos 07<br />

(b) VCB1 Nos 06<br />

© ACBI Nos 11<br />

(d) UPS 3 KV Nos 02<br />

(e) UPS 1 KV Nos 03<br />

(f) Invertors Nos 02<br />

(g) MCCB Nos 28<br />

(h) Light fittings Nos 400<br />

(j) Lighting ckt Nos 20<br />

Tunnel vehicle occupancy system<br />

1 TOC Nos 01<br />

2 Signals Nos 06<br />

3 Mimic console integrated with software & Hardware<br />

control system with control peint of 400 Nos<br />

Nos<br />

___________________________<br />

(Signature of contractor with seal)<br />

sd/- xxx<br />

SW<br />

For Accepting Officer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!