CA NO: CDR/760TF/ / 2012-13 Ser Page No: 58<br />

S/No Equipme<br />

nt<br />

8 Soft<br />

starter<br />

panel<br />

9 Air<br />

Cooled<br />

Transfor<br />

mer<br />

10 Integrate<br />

d Control<br />

&<br />

Monitorin<br />

g System<br />

Schedule Weekly Monthly<br />

Check and repair for any visual damage ***<br />

Blow dust, if any, inside the panel.<br />

Carry out tighten of cable glands<br />

Check and be sure for door locking<br />

Tight all the connections<br />

Check and ensure for proper earthing<br />

Check and signs of over heating of cables and terminals. Do<br />

necessary repairing within 24 hrs, if noticed.<br />

Check operation of MCB, RCCB, by-pass contractor etc,<br />

check also the contract springs have correct springiness<br />

rectify/change if necessary<br />

Check time taken by fan to reach top of the ramp<br />

Clean insulators with dry cloths and look for chipping cracks,<br />

etc. If found replace on top priority. No by-pass allowed<br />

Clean externally transformer body, radiators bushing,<br />

temperature indicator etc with dry cloths.<br />

Any minor/major defects noticed, same to be brought to the<br />

notice of officers concerned and repairing to be carried on<br />

priority.<br />

Note maximum temperature. Reset indicator<br />

Clean and check of cameras lenses<br />

Clean and check DGP & NPU regularly(daily) and major<br />

defects to be rectified with 15 days<br />

Clean visibility sensors & temp gauge regularly. Any major<br />

defects to be rectified within 7 days<br />

Clean luminous meter regularly. Any major defects to be<br />

rectified within 7 days<br />

Clean wind velocity meter regularly. Any major defects to be<br />

rectified with 7 days<br />

Clean and check vane switches of jet Fans.<br />

Replace immediately if found defect<br />

Clean and check occupancy sensor regularly<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

***<br />

___________________________<br />

(Signature of contractor with seal)<br />

sd/- xxx<br />

SW<br />

For Accepting Officer