CA NO: CDR/760TF/ / 2012-13 Ser Page No: 56<br />

Annexure ‘B’<br />

POWER SUPPLY SYTEM,LIGHTING AND VENTILATION SYSTEM AND MONITORING AND<br />

CONTROL SYSTEM MAINTENANCE SCHEDULE.<br />

S/No Equipme Schedule Weekly Monthly<br />

nt<br />

1 General Check general illumination in tunnel area. Replace fused<br />

lamps immediately.<br />

Check operation of telephones and repair immediately, if<br />

***<br />

***<br />

found defective<br />

Check first aid boxes, fire buckets, fire extinguishers, etc, are ***<br />

intact and serviceable.<br />

Replenish on priority.<br />

Inspect fence all around the substation and to earth & repair<br />

***<br />

immediately if required.<br />

Check security and fire risk for storage of transformer oil, lub<br />

oil, control circuit drawings, operating instructions, etc are<br />

clean and well secured. If not then do accordingly for proper<br />

display.<br />

2 Oil<br />

Cooled<br />

Transfor<br />

mer<br />

Examine if all “caution” “danger” boards, shock treatment<br />

charts, control circuit drawings, operating instructions, etc are<br />

clean and well secured. If not then do accordingly for proper<br />

display.<br />

Check condition of power/control cable/sensors and<br />

***<br />

***<br />

repair/change immediately if found damaged/defective.<br />

Note maximum temperature on dial indicator. Reset indicator ***<br />

Check silica gel breather if pink reactive/replace with dry gel.<br />

***<br />

Check oil level-check all joints for signs of oil leakage, Add<br />

oil, if required.<br />

***<br />

Clean externally transformer tank radiators bushing oil level<br />

indicator, gauges etc with dry cloth.<br />

***<br />

Clean externally transformer tank radiators bushing, oil level<br />

indicator, gauge, etc with dry cloth<br />

***<br />

Any minor/major defects noticed, same to be brought to the<br />

notice of officers concerned and repairing tobe carried on<br />

3 Gang<br />

operated<br />

switches<br />

4 Power<br />

panels<br />

priority within 24 hrs<br />

Check for proper alignment of the fixed and moving contact. If<br />

not then reset/calibrate the alignment with 24 hrs.<br />

Check insulators for any chipping cracks etc, clean with a dry<br />

cloth. Replace the insulators immediately, if cracked.<br />

Check operation of all indicating lamps and alarm circuits. If ***<br />

operation is improper then replace/rectify the defects<br />

immediately<br />

Blow dust, if any, inside the panel ***<br />

Check & make sure tightness of all the connections in power<br />

panels<br />

***<br />

***<br />

***<br />

___________________________<br />

(Signature of contractor with seal)<br />

sd/- xxx<br />

SW<br />

For Accepting Officer