CA NO: CDR/760TF/ / 2012-13 Ser Page No: 50<br />

(i) The rate quoted shall also include transportation of store/materials required for<br />

maintenance, transportation of store/equipments upto site where required including<br />

loading/unloading charges.<br />

(ii) The rate quoted shall also include cost of all tests carried out by the contractor either at site<br />

or in western field lab at Udhampur / in any Govt laboratory.<br />

MEASUREMENT<br />

19. Monitoring and recording of services will be done on a daily basis. Record of service will be<br />

maintained in daily maint register, weekly maint register, and monthly maint register as per schedule<br />

of maint given in annexure ‘B’. Recording of spares and time taken for rectification will be recorded in<br />

a separate register. These registers shall be signed by the Engr-in-Charge and the Contractor duly<br />

counter signed by the OC contract.<br />

TIME FOR WORK<br />

20. All routine maint shall be carried out during night only except when emergency maint is required<br />

during day where permission of Engr-in-Charge shall be obtained by the Contractor.<br />

COMPENSATION<br />

21. The Department is not liable to pay any compensation on account of any injury/ damage to<br />

labours and vehicles deployed by contractor caused due to accident/ militant activity/ any other<br />

reason occurred during execution of CA.<br />

22. The contractor will ensure that all defects noticed will be attended / repaired within one day.<br />

Also proper guarantee / warranty of repaired parts / replaced items will be given to Engineer-In-<br />

Charge as and when it is replaced.<br />

23. In case, the service provider fails to meet his obligation within the stipulated time frame, penalty /<br />

compensation will be imposed on contractor as per defects / time taken to repair it. Imposing penalty<br />

/ compensation, decision of Accepting Officer will be final.<br />

24. ACCEPTANCE OF WORK DONE: The Engineer-in-Charge/ OC contract shall exercise control<br />

over the quality of materials and work done by carrying out tests for the specified properties as per<br />

frequencies given in particular specifications.<br />

25. ESCALATION: No claim of reimbursement in increase of labour wages, cost of POL and<br />

materials is admissible under this contract including extended period if any.<br />

26. Blank<br />

27. INCOME TAX: Income Tax along with education cess and service/works contract tax will be<br />

deducted at source as applicable.<br />

28 ROYALTIES<br />

28.1. The condition in Clause 14 of General condition of IAFW-2249 is not applicable to this<br />

contract and hence treated to be cancelled. The contractor shall make his own arrangement for<br />

procurement of materials required for AMC of tunnel as mentioned in the schedule ‘A’ and elsewhere.<br />

Royalties are payable by the contractor.<br />

___________________________<br />

(Signature of contractor with seal)<br />

sd/- xxx<br />

SW<br />

For Accepting Officer