CA NO: CDR/760TF/ / 2012-13 Ser Page No: 46<br />

SPECIAL CONDITIONS<br />

NAME OF WORK: ANNUAL MAINT CONTRACT FOR MAINTENANCE OF VENTILATION,<br />

LIGHTING, POWER SUPPLY AND MONITORING SYSTEM OF 2.50 KM LONG TWIN TUBES OF<br />

JAWAHAR TUNNEL AT KM 204.600 ON JAMMU-SRINAGAR ROAD (NH-44) UNDER 760 BRTF<br />

SECTOR PROJECT BEACON IN J & K STATE .<br />

1. The special conditions shall be read in conjunction with General Conditions of Contract IAFW –<br />

2249 and wherever variation exists, the General Specifications shall take precedence over the aforesaid<br />

special conditions.<br />

2. The special conditions given in succeeding paragraphs shall be read in conjunction with Schedule<br />

“A”, particular specifications and General Conditions of Contract IAFW 1779A. In case of any<br />

discrepancies in the various provisions of the contract, the following order of precedence shall be<br />

observed: -<br />

(a) Description given in Schedule “A”.<br />

(b) Particular Specifications.<br />

(c) Special conditions of contract.<br />

(d) General Conditions of Contract IAFW 2249.<br />

3. INSPECTION OF SITES: The contractor is particularly advised to inspect the proposed site with<br />

prior appointment with Commander 760 BRTF, C/O 56 APO so as to acquaint himself in regards to the<br />

nature and conditions of site, local facilities for access and other cognate matters, affecting the execution<br />

and completion of the work. This department will allow no extra charge in consequent to<br />

misunderstanding or otherwise. Any paths, tracks, approaches etc., required for the movement of Plants,<br />

Equipment, Machines, Vehicles etc., to the work site and platform, bund etc., required for the execution<br />

of work, will be the responsibility of the contractor and rates quoted by him / her must include these<br />

aspects also, wherever, required.<br />

4. LAND FOR OFFICES ETC: The contractor shall make his / her own arrangement for the land<br />

required for housing the staff and labour and for erection of store sheds, offices, godowns etc., required<br />

by him / her for this work. The contractor must ensure that the staff, labour, plant, equipment, machines,<br />

vehicles, stores etc., employed or collected in connection with the work, are so positioned that there is no<br />

hindrance to free flow of vehicular traffic on the roads. Suitable cautionary and warning signs boards and<br />

other measures are to be installed / provided by the contractor at his own cost for the safety of traffic.<br />

5. WATER: Contractor shall make his own arrangement for the supply of water required for this<br />

work and for the use of his / her staff / workmen at his own expenses. The contractor shall also arrange<br />

for storage and conveyance of water, if necessary, at his own cost.<br />

6. FREE ACCESS TO SITES AND LOOKING AFTER OF WORKS : The contractor shall give all<br />

responsible facilities to this department personnel for the Inspection of works, being executed under this<br />

contract. He / she shall also provide free access to the works if beings executed by this Department or<br />

other Agencies, if such works are located near the sites covered under this contract. Responsibility of all<br />

the works covered in this contract will lie with the work contractor till these works are fully completed and<br />

accordingly handed over to this department.<br />

___________________________<br />

(Signature of contractor with seal)<br />

sd/- xxx<br />

SW<br />

For Accepting Officer