28.10.2014 Views

TEESTA DAM

TEESTA DAM

TEESTA DAM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INDIA<br />

<strong>TEESTA</strong> <strong>DAM</strong><br />

Cut - off wall / Permeation<br />

grouting<br />

<strong>TEESTA</strong> <strong>DAM</strong> PROJECT<br />

UPSTREAM COFFER <strong>DAM</strong>(NHPC)<br />

CUT-OFF ELEVATION<br />

LEFT BANK<br />

1<br />

RIGHT BANK<br />

A<br />

A1<br />

TOP OF JET GROUT CUT-OFF EL:539.00<br />

A2<br />

WORKING PLATFORM<br />

EL:540.00<br />

B<br />

DDH06<br />

A3<br />

A4<br />

<strong>TEESTA</strong> RIVER<br />

A5<br />

A6<br />

A7<br />

DDH07<br />

base of the clay core<br />

subject to NHPC<br />

dierctive<br />

LEGEND:<br />

ROCK PROFILE<br />

25/10/2002<br />

NOTE<br />

Rock fissure grouting below the jet grout cut-off wall:<br />

To be decided by the Engineer after the Lugeon tests to be<br />

carried out below the cut-off wall<br />

NOTE<br />

A1 - A7 : EXPLORATORY HOLES<br />

DDH06 - DDH07 : PREVIOUS GEOLOGICAL INVESTIGATION HOLES<br />

(EXPLORATORY HOLES)<br />

802503 -<br />

7/37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!