INDIA<br />

<strong>TEESTA</strong> <strong>DAM</strong><br />

Jet - grouted cut - off wall /<br />

Permeation grouting<br />

PERMEATION GROUTING<br />

Systematic complementary treatment<br />

- 1 line at 1.2m spacing<br />

- Systematic first phase of grouting BC + Gel<br />

- Final phase based on the following factors :<br />

- results of the first phase<br />

- deviation and diameter of the jet<br />

columns<br />

- deviation of the grout holes<br />

- mapping of the boulders<br />