You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Zarat Field<br />
Greater Zarat Anticline<br />
-Regional structural high >25,000<br />
acres<br />
GOC ~-2,660m<br />
(dark red + green)<br />
OWC ~-2,700m<br />
(yellow / orange boundary)<br />
<strong>Sonde</strong><br />
-Reservoir: Eocene El Gueria limestone,<br />
gas / condensate / oil proven in 3 wells<br />
-Marathon Zarat 1: 279 ft net pay<br />
-<strong>Sonde</strong> Zarat N-1: 240 ft net pay<br />
-Marathon Zarat 1: Test rates as high as<br />
15 MMCF + 1,192 BO / day<br />
-<strong>Sonde</strong> Zarat N-1: Stabilized test rate<br />
8 MMCF + 750 BO / day, peak rates<br />
1,100 BO / day<br />
<strong>Sonde</strong> Zarat North-1<br />
<strong>Sonde</strong><br />
ENI<br />
1 sq km<br />
PA<br />
Marathon Zarat 1