ECONOmy<br />

|78<br />

ment No. 38647 dated 5 June 2008. As of the<br />

end of 2009 KEGOC had disbursed EUR 0.46<br />

mln; and EUR 2.33 mln of KEGOC own funds.<br />

In 2009 the project tender was prepared to<br />

meet the commencement of work in 2010.<br />

4mOiNaK ElECTriCiTy<br />

TraNSmiSSiON prOJECT<br />

The main project objective is to secure<br />

power delivery from the 300 MW Moinak<br />

HPP, being constructed to reduce energy<br />

deficiency and to cover peak loads, and to<br />

provide a reliable power supply to consumers<br />

of Almaty Oblast and overall South Kazakhstan.<br />

KZT 26.3 mln worth of capital expenditures<br />

was disbursed under the project. The<br />

estimated cost as well as the financial and<br />

economical parts of FS were adjusted.<br />

5alma ElECTriCiTy<br />

TraNSmiSSiON prOJECT<br />

The main project objective is to secure<br />

a reliable power supply over the Almaty<br />

region, power delivery from the first stage of<br />

Balkhash TPP (1 320 MW), to create engineering<br />

potential for the development of Almaty’s<br />

satellite towns, the construction of industrial<br />

park in Almaty and the infrastructure for the<br />

Asian Games in 2011.<br />

Capital expenses under the project were<br />

disbursed to the amount of KZT 10.4 mln.<br />

Design and estimate documentation was<br />

developed and construction of operational<br />

premises at 500 kV Alma SS was commenced.<br />

6mODErNizaTiON Of 220<br />

Kv Oh Tl TSgpp – OSSa-<br />

KarOvKa<br />

In 2009 for the purpose of project implementation<br />

a contract on preparation of a feasibility<br />

study was concluded.<br />

TES Of ThE prOJECT iS bEiNg WOrKED ON<br />

aS WEll aS ThE DED bEiNg prEparED fOr<br />

ThE faCiliTiES ThaT arE a TOp priOriTy. thE<br />

coNstRuctioN of thE fiRst fAcilitiEs stARtEd<br />

iN JANuARY 2010.