kV Nickolskaya SS, 220 kV Sarbaiskaya SS, 220 kV<br />
Kairakty SS, 220 kV Akshatau SS; for modernization<br />
of the main protection at 22 transmission<br />
lines of 110–220 kV; and for modernization of 20<br />
channels of PLC-communication, protective relay<br />
and substation automation.<br />
2CONSTruCTiON Of 500 Kv<br />
SECOND TraNSmiSSiON liNE<br />
Of KazaKhSTaN NOrTh-<br />
SOuTh TraNSiT<br />
The main project objectives are to secure power<br />
supply to the deficit southern regions of Kazakhstan<br />
by means of higher (up to 7-7.5 bln kWh<br />
per year) transmission capacity from North to<br />
South, and to improve availability and operational<br />
security of the National Power Grid of Kazakhstan<br />
and parallel operation of Russian, Kazakhstan<br />
and Central Asian power systems. Construction of<br />
500 kV Second Transmission Line of Kazakhstan<br />
North-South Transit (1 096.94 km) was completed<br />
in accordance with the project implementation<br />
plan.<br />
The total project value according to the approved<br />
FS was KZT 43.7 bln. In 2009 the project capital<br />
expenditures were disbursed to the amount of<br />
KZT 18 220.8 mln.<br />
3KazaKhSTaN ElECTriCiTy<br />
TraNSmiSSiON rEhabiliTa-<br />
TiON prOJECT, phaSE ii<br />
The main project objectives are to secure reliable<br />
and safe operation of the National Power Grid of<br />
Kazakhstan; to improve electricity market performance,<br />
reliability and quality of electricity supply<br />
to consumers, technical and environmental safety<br />
of high-voltage equipment and to reduce the<br />
cost of equipment operation and maintenance.<br />
The project requires partial modernization of 55<br />
high-voltage substations including replacement of<br />
high-voltage and power equipment, and modernization<br />
of protective relays.<br />
Project value is EUR 257.33 mln including EUR<br />
255.00 mln granted by EBRD under Loan AgreeprOJECT<br />
valuE iS<br />
Eur 257.33 mlN iNCluDiNg<br />
Eur 255.00 mlN graNTED by EbrD<br />
uNDEr lOaN agrEEmENT NO. 38647<br />
DaTED 5 JuNE 2008.