26.10.2014 Views

Coast Mountain Power Corp. - Minerals North

Coast Mountain Power Corp. - Minerals North

Coast Mountain Power Corp. - Minerals North

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

COAST MOUNTAIN<br />

POWER CORP.<br />

<strong>Minerals</strong> <strong>North</strong> April 2005


<strong>Corp</strong>orate<br />

Overview<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

1


•<br />

<strong>Corp</strong>orate Structure<br />

•Est. 1999<br />

•TSX: Venture Exchange<br />

•Ticker Symbol: MW<br />

•FD shares o/s ~19 million<br />

•<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

•<br />

<strong>Power</strong> <strong>Corp</strong>.<br />

100%<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

Hydro <strong>Corp</strong>.<br />

100%<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

Transmission <strong>Corp</strong>.<br />

•<br />

Forrest Kerr Project<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

2


<strong>Coast</strong> <strong>Mountain</strong> Hydro <strong>Corp</strong>.<br />

Forrest Kerr 115 MW<br />

Run-of -River<br />

Hydroelectric Project


Project<br />

Overview<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

4


Project Locations<br />

Forrest Kerr<br />

Project<br />

Project Location<br />

More Creek<br />

Iskut River<br />

Project<br />

Bob Quinn Lake<br />

Eskay Creek<br />

Mine (Barrick)<br />

New Transmission<br />

Line<br />

N<br />

50 km<br />

Stewart<br />

Meziadin Junction<br />

(BC Hydro Grid)<br />

Hwy 37<br />

Existing Road Network<br />

USA<br />

CANADA<br />

Prince Rupert<br />

Terrace<br />

Smithers<br />

HWY 16 & CN Rail<br />

New Transmission Line<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

5


Key Project Facts<br />

Generation:<br />

Transmission:<br />

Project Timeline:<br />

• Green <strong>Power</strong> Project<br />

• Pure Run-of-River facility - No impounding<br />

• Installed capacity of 115 MW<br />

• Plant capacity factor of ~61%<br />

• ~606 GwH annual production ~555 GwH at<br />

delivery point (Meziadin)<br />

• Inter-connection with BC Hydro grid at<br />

Meziadin Junction<br />

• New 177 km 138kV AC transmission line<br />

to be owned by the company<br />

• Transmission Line Capacity 200MW<br />

• Interconnection Capacity 115MW<br />

• ~Two year procurement, construction,<br />

& commissioning time frame from financing<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

6


Project Site Map<br />

•Underground<br />

•<strong>Power</strong>house<br />

•FORREST KERR<br />

•PROJECT SITE MAP<br />

•Iskut • River<br />

•Weir & Intake<br />

•3.2 km <strong>Power</strong> Tunnel<br />

•Forrest • Kerr<br />

•Creek<br />

Access<br />

Tunnel<br />

~3 km to<br />

mine road<br />

•Access Road<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

7


Abundant Resource<br />

Iskut River Average Daily Flow at the Intake<br />

900<br />

800<br />

700<br />

Flow at the<br />

Intake<br />

Cubic Meters Sec -1<br />

600<br />

500<br />

400<br />

300<br />

200<br />

Permitted Flow<br />

156 cms<br />

Iskut River<br />

above Forrest<br />

Kerr Creek<br />

Forrest Kerr above<br />

intake<br />

100<br />

0<br />

Jan Feb Mar Apr May Jun<br />

Jul Aug Sep Oct Nov Dec<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

8


Proposed<br />

Intake Structure<br />

Iskut River<br />

Proposed<br />

Weir<br />

Forrest Kerr Creek<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

9


Agreements, Permits and Approvals<br />

• Electricity Purchase Agreement<br />

• All necessary development approvals obtained<br />

• Provincial (BCEA) Environmental Assessment<br />

Certificate (Amended July 2003, July 2004)<br />

• Federal (CEAA) & Navigable Waters<br />

• Provincial Water Licence issued<br />

• Secured all necessary land tenure for the<br />

development of the project<br />

• Have signed a formal participation agreement<br />

with the Iskut and Tahltan First Nations<br />

• Permanent Road Use Agreement with Barrick<br />

Gold<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

10


Project Development<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

11


Project Areas<br />

CIVIL GROUP<br />

POWER GROUP<br />

Civil<br />

Works<br />

Underground<br />

Excavations<br />

Water to Wire<br />

Turbine/Gens<br />

Transmission<br />

Line<br />

Substations<br />

Interconnection<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

12


General Site Development<br />

• The 8 km access road<br />

completed<br />

• Camp and service, spoil and<br />

portal areas are cleared<br />

• Turn-key contract for 120 man<br />

camp under negotiation<br />

• 6 man camp and office trailers<br />

on-site<br />

• Detailed site surveys have been<br />

completed<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

13


Suppliers and Contractors<br />

• Civil Works<br />

• Design by nhc /Gygax<br />

• Contract not awarded<br />

• Intake Weir & Balance of Plant<br />

Gygax<br />

Engineering<br />

Associates Ltd.<br />

nhc northwest<br />

hydraulic<br />

consultants<br />

• Turbines / Generators<br />

• GE Hydro Supply Install<br />

• 3 Turbines/Generators @ 38.5 MW<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

14


Suppliers and Contractors<br />

Underground Excavations<br />

• Thyssen /Ostu- Stettin (Can/Austria)<br />

• 4.7km Tunnels, ~6mX8m in diameter<br />

• Underground powerhouse<br />

Transmission Line<br />

• Transmission design BC Hydro<br />

• 177km 138kV single wood pole<br />

• Contract not awarded<br />

Interconnection<br />

• Interconnection and Site Substations<br />

• Siemens Canada Ltd<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

15


Project Economics/ Schedule<br />

•Capital Costs Estimated ~$220million<br />

•Annual Gross Revenues of ~$30million<br />

•Commercial Operation Date 2 nd Quarter 2007<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

16


<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

MORE CREEK 19 MW<br />

HYDROELECTRIC<br />

PROJECT


Project Locations<br />

Forrest Kerr<br />

Project<br />

Project Location<br />

More Creek<br />

Iskut River<br />

Project<br />

Bob Quinn Lake<br />

Eskay Creek<br />

Mine (Barrick)<br />

New Transmission<br />

Line<br />

N<br />

50 km<br />

Stewart<br />

Meziadin Junction<br />

(BC Hydro Grid)<br />

Hwy 37<br />

Existing Road Network<br />

USA<br />

CANADA<br />

Prince Rupert<br />

Terrace<br />

Smithers<br />

HWY 16 & CN Rail<br />

New Transmission Line<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

18


Key Project Facts<br />

Generation:<br />

Transmission:<br />

Project Timeline:<br />

• Green <strong>Power</strong> Project<br />

• Run-of-River facility<br />

• Installed capacity of 19.6 Mw<br />

• Plant capacity factor of ~55%<br />

• ~84 GwH annual production<br />

delivery point (Bob Quinn Lake Area)<br />

• Inter-connection with 138 kv grid near<br />

Bob Quinn Lake<br />

• New 13 km 69kV AC transmission line<br />

to be owned by the company<br />

• Two year procurement, construction,<br />

& commissioning time frame from financing<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

19


Advantages and Opportunities<br />

•Size of the Project 115 MW<br />

•Water Availability<br />

•Location in un-serviced area<br />

•Local market potential<br />

(est. 100MW)<br />

•Wheeling of power<br />

• Transmission line capacity<br />

(~1500Gwh)<br />

•Alaska intertie<br />

•<strong>North</strong>ern Utility<br />

(<strong>Coast</strong> <strong>Mountain</strong> Transmission <strong>Corp</strong>.)<br />

PROJECT<br />

SITE<br />

ALASKA<br />

TELEGRAPH<br />

CREEK<br />

DEASE LAKE<br />

ISKUT<br />

OIL GAS COAL BED<br />

METHANE<br />

MEZIADIN<br />

LOAD POTENTIAL<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

20


<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

Contact Information:<br />

Suite 707- 1281 West Georgia Street<br />

Vancouver, BC V6E 3J7<br />

www.coastmountainpower.ca<br />

Phone: 604-681-8680<br />

Fax: 604-681-8646

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!