Coast Mountain Power Corp. - Minerals North
Coast Mountain Power Corp. - Minerals North
Coast Mountain Power Corp. - Minerals North
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COAST MOUNTAIN<br />
POWER CORP.<br />
<strong>Minerals</strong> <strong>North</strong> April 2005
<strong>Corp</strong>orate<br />
Overview<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
1
•<br />
<strong>Corp</strong>orate Structure<br />
•Est. 1999<br />
•TSX: Venture Exchange<br />
•Ticker Symbol: MW<br />
•FD shares o/s ~19 million<br />
•<br />
<strong>Coast</strong> <strong>Mountain</strong><br />
•<br />
<strong>Power</strong> <strong>Corp</strong>.<br />
100%<br />
<strong>Coast</strong> <strong>Mountain</strong><br />
Hydro <strong>Corp</strong>.<br />
100%<br />
<strong>Coast</strong> <strong>Mountain</strong><br />
Transmission <strong>Corp</strong>.<br />
•<br />
Forrest Kerr Project<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
2
<strong>Coast</strong> <strong>Mountain</strong> Hydro <strong>Corp</strong>.<br />
Forrest Kerr 115 MW<br />
Run-of -River<br />
Hydroelectric Project
Project<br />
Overview<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
4
Project Locations<br />
Forrest Kerr<br />
Project<br />
Project Location<br />
More Creek<br />
Iskut River<br />
Project<br />
Bob Quinn Lake<br />
Eskay Creek<br />
Mine (Barrick)<br />
New Transmission<br />
Line<br />
N<br />
50 km<br />
Stewart<br />
Meziadin Junction<br />
(BC Hydro Grid)<br />
Hwy 37<br />
Existing Road Network<br />
USA<br />
CANADA<br />
Prince Rupert<br />
Terrace<br />
Smithers<br />
HWY 16 & CN Rail<br />
New Transmission Line<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
5
Key Project Facts<br />
Generation:<br />
Transmission:<br />
Project Timeline:<br />
• Green <strong>Power</strong> Project<br />
• Pure Run-of-River facility - No impounding<br />
• Installed capacity of 115 MW<br />
• Plant capacity factor of ~61%<br />
• ~606 GwH annual production ~555 GwH at<br />
delivery point (Meziadin)<br />
• Inter-connection with BC Hydro grid at<br />
Meziadin Junction<br />
• New 177 km 138kV AC transmission line<br />
to be owned by the company<br />
• Transmission Line Capacity 200MW<br />
• Interconnection Capacity 115MW<br />
• ~Two year procurement, construction,<br />
& commissioning time frame from financing<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
6
Project Site Map<br />
•Underground<br />
•<strong>Power</strong>house<br />
•FORREST KERR<br />
•PROJECT SITE MAP<br />
•Iskut • River<br />
•Weir & Intake<br />
•3.2 km <strong>Power</strong> Tunnel<br />
•Forrest • Kerr<br />
•Creek<br />
Access<br />
Tunnel<br />
~3 km to<br />
mine road<br />
•Access Road<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
7
Abundant Resource<br />
Iskut River Average Daily Flow at the Intake<br />
900<br />
800<br />
700<br />
Flow at the<br />
Intake<br />
Cubic Meters Sec -1<br />
600<br />
500<br />
400<br />
300<br />
200<br />
Permitted Flow<br />
156 cms<br />
Iskut River<br />
above Forrest<br />
Kerr Creek<br />
Forrest Kerr above<br />
intake<br />
100<br />
0<br />
Jan Feb Mar Apr May Jun<br />
Jul Aug Sep Oct Nov Dec<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
8
Proposed<br />
Intake Structure<br />
Iskut River<br />
Proposed<br />
Weir<br />
Forrest Kerr Creek<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
9
Agreements, Permits and Approvals<br />
• Electricity Purchase Agreement<br />
• All necessary development approvals obtained<br />
• Provincial (BCEA) Environmental Assessment<br />
Certificate (Amended July 2003, July 2004)<br />
• Federal (CEAA) & Navigable Waters<br />
• Provincial Water Licence issued<br />
• Secured all necessary land tenure for the<br />
development of the project<br />
• Have signed a formal participation agreement<br />
with the Iskut and Tahltan First Nations<br />
• Permanent Road Use Agreement with Barrick<br />
Gold<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
10
Project Development<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
11
Project Areas<br />
CIVIL GROUP<br />
POWER GROUP<br />
Civil<br />
Works<br />
Underground<br />
Excavations<br />
Water to Wire<br />
Turbine/Gens<br />
Transmission<br />
Line<br />
Substations<br />
Interconnection<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
12
General Site Development<br />
• The 8 km access road<br />
completed<br />
• Camp and service, spoil and<br />
portal areas are cleared<br />
• Turn-key contract for 120 man<br />
camp under negotiation<br />
• 6 man camp and office trailers<br />
on-site<br />
• Detailed site surveys have been<br />
completed<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
13
Suppliers and Contractors<br />
• Civil Works<br />
• Design by nhc /Gygax<br />
• Contract not awarded<br />
• Intake Weir & Balance of Plant<br />
Gygax<br />
Engineering<br />
Associates Ltd.<br />
nhc northwest<br />
hydraulic<br />
consultants<br />
• Turbines / Generators<br />
• GE Hydro Supply Install<br />
• 3 Turbines/Generators @ 38.5 MW<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
14
Suppliers and Contractors<br />
Underground Excavations<br />
• Thyssen /Ostu- Stettin (Can/Austria)<br />
• 4.7km Tunnels, ~6mX8m in diameter<br />
• Underground powerhouse<br />
Transmission Line<br />
• Transmission design BC Hydro<br />
• 177km 138kV single wood pole<br />
• Contract not awarded<br />
Interconnection<br />
• Interconnection and Site Substations<br />
• Siemens Canada Ltd<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
15
Project Economics/ Schedule<br />
•Capital Costs Estimated ~$220million<br />
•Annual Gross Revenues of ~$30million<br />
•Commercial Operation Date 2 nd Quarter 2007<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
16
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
MORE CREEK 19 MW<br />
HYDROELECTRIC<br />
PROJECT
Project Locations<br />
Forrest Kerr<br />
Project<br />
Project Location<br />
More Creek<br />
Iskut River<br />
Project<br />
Bob Quinn Lake<br />
Eskay Creek<br />
Mine (Barrick)<br />
New Transmission<br />
Line<br />
N<br />
50 km<br />
Stewart<br />
Meziadin Junction<br />
(BC Hydro Grid)<br />
Hwy 37<br />
Existing Road Network<br />
USA<br />
CANADA<br />
Prince Rupert<br />
Terrace<br />
Smithers<br />
HWY 16 & CN Rail<br />
New Transmission Line<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
18
Key Project Facts<br />
Generation:<br />
Transmission:<br />
Project Timeline:<br />
• Green <strong>Power</strong> Project<br />
• Run-of-River facility<br />
• Installed capacity of 19.6 Mw<br />
• Plant capacity factor of ~55%<br />
• ~84 GwH annual production<br />
delivery point (Bob Quinn Lake Area)<br />
• Inter-connection with 138 kv grid near<br />
Bob Quinn Lake<br />
• New 13 km 69kV AC transmission line<br />
to be owned by the company<br />
• Two year procurement, construction,<br />
& commissioning time frame from financing<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
19
Advantages and Opportunities<br />
•Size of the Project 115 MW<br />
•Water Availability<br />
•Location in un-serviced area<br />
•Local market potential<br />
(est. 100MW)<br />
•Wheeling of power<br />
• Transmission line capacity<br />
(~1500Gwh)<br />
•Alaska intertie<br />
•<strong>North</strong>ern Utility<br />
(<strong>Coast</strong> <strong>Mountain</strong> Transmission <strong>Corp</strong>.)<br />
PROJECT<br />
SITE<br />
ALASKA<br />
TELEGRAPH<br />
CREEK<br />
DEASE LAKE<br />
ISKUT<br />
OIL GAS COAL BED<br />
METHANE<br />
MEZIADIN<br />
LOAD POTENTIAL<br />
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
20
<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />
Contact Information:<br />
Suite 707- 1281 West Georgia Street<br />
Vancouver, BC V6E 3J7<br />
www.coastmountainpower.ca<br />
Phone: 604-681-8680<br />
Fax: 604-681-8646