COAST MOUNTAIN<br />

POWER CORP.<br />

<strong>Minerals</strong> <strong>North</strong> April 2005


<strong>Corp</strong>orate<br />

Overview<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

1


•<br />

<strong>Corp</strong>orate Structure<br />

•Est. 1999<br />

•TSX: Venture Exchange<br />

•Ticker Symbol: MW<br />

•FD shares o/s ~19 million<br />

•<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

•<br />

<strong>Power</strong> <strong>Corp</strong>.<br />

100%<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

Hydro <strong>Corp</strong>.<br />

100%<br />

<strong>Coast</strong> <strong>Mountain</strong><br />

Transmission <strong>Corp</strong>.<br />

•<br />

Forrest Kerr Project<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

2


<strong>Coast</strong> <strong>Mountain</strong> Hydro <strong>Corp</strong>.<br />

Forrest Kerr 115 MW<br />

Run-of -River<br />

Hydroelectric Project


Project<br />

Overview<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

4


Project Locations<br />

Forrest Kerr<br />

Project<br />

Project Location<br />

More Creek<br />

Iskut River<br />

Project<br />

Bob Quinn Lake<br />

Eskay Creek<br />

Mine (Barrick)<br />

New Transmission<br />

Line<br />

N<br />

50 km<br />

Stewart<br />

Meziadin Junction<br />

(BC Hydro Grid)<br />

Hwy 37<br />

Existing Road Network<br />

USA<br />

CANADA<br />

Prince Rupert<br />

Terrace<br />

Smithers<br />

HWY 16 & CN Rail<br />

New Transmission Line<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

5


Key Project Facts<br />

Generation:<br />

Transmission:<br />

Project Timeline:<br />

• Green <strong>Power</strong> Project<br />

• Pure Run-of-River facility - No impounding<br />

• Installed capacity of 115 MW<br />

• Plant capacity factor of ~61%<br />

• ~606 GwH annual production ~555 GwH at<br />

delivery point (Meziadin)<br />

• Inter-connection with BC Hydro grid at<br />

Meziadin Junction<br />

• New 177 km 138kV AC transmission line<br />

to be owned by the company<br />

• Transmission Line Capacity 200MW<br />

• Interconnection Capacity 115MW<br />

• ~Two year procurement, construction,<br />

& commissioning time frame from financing<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

6


Project Site Map<br />

•Underground<br />

•<strong>Power</strong>house<br />

•FORREST KERR<br />

•PROJECT SITE MAP<br />

•Iskut • River<br />

•Weir & Intake<br />

•3.2 km <strong>Power</strong> Tunnel<br />

•Forrest • Kerr<br />

•Creek<br />

Access<br />

Tunnel<br />

~3 km to<br />

mine road<br />

•Access Road<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

7


Abundant Resource<br />

Iskut River Average Daily Flow at the Intake<br />

900<br />

800<br />

700<br />

Flow at the<br />

Intake<br />

Cubic Meters Sec -1<br />

600<br />

500<br />

400<br />

300<br />

200<br />

Permitted Flow<br />

156 cms<br />

Iskut River<br />

above Forrest<br />

Kerr Creek<br />

Forrest Kerr above<br />

intake<br />

100<br />

0<br />

Jan Feb Mar Apr May Jun<br />

Jul Aug Sep Oct Nov Dec<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

8


Proposed<br />

Intake Structure<br />

Iskut River<br />

Proposed<br />

Weir<br />

Forrest Kerr Creek<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

9


Agreements, Permits and Approvals<br />

• Electricity Purchase Agreement<br />

• All necessary development approvals obtained<br />

• Provincial (BCEA) Environmental Assessment<br />

Certificate (Amended July 2003, July 2004)<br />

• Federal (CEAA) & Navigable Waters<br />

• Provincial Water Licence issued<br />

• Secured all necessary land tenure for the<br />

development of the project<br />

• Have signed a formal participation agreement<br />

with the Iskut and Tahltan First Nations<br />

• Permanent Road Use Agreement with Barrick<br />

Gold<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

10


Project Development<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

11


Project Areas<br />

CIVIL GROUP<br />

POWER GROUP<br />

Civil<br />

Works<br />

Underground<br />

Excavations<br />

Water to Wire<br />

Turbine/Gens<br />

Transmission<br />

Line<br />

Substations<br />

Interconnection<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

12


General Site Development<br />

• The 8 km access road<br />

completed<br />

• Camp and service, spoil and<br />

portal areas are cleared<br />

• Turn-key contract for 120 man<br />

camp under negotiation<br />

• 6 man camp and office trailers<br />

on-site<br />

• Detailed site surveys have been<br />

completed<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

13


Suppliers and Contractors<br />

• Civil Works<br />

• Design by nhc /Gygax<br />

• Contract not awarded<br />

• Intake Weir & Balance of Plant<br />

Gygax<br />

Engineering<br />

Associates Ltd.<br />

nhc northwest<br />

hydraulic<br />

consultants<br />

• Turbines / Generators<br />

• GE Hydro Supply Install<br />

• 3 Turbines/Generators @ 38.5 MW<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

14


Suppliers and Contractors<br />

Underground Excavations<br />

• Thyssen /Ostu- Stettin (Can/Austria)<br />

• 4.7km Tunnels, ~6mX8m in diameter<br />

• Underground powerhouse<br />

Transmission Line<br />

• Transmission design BC Hydro<br />

• 177km 138kV single wood pole<br />

• Contract not awarded<br />

Interconnection<br />

• Interconnection and Site Substations<br />

• Siemens Canada Ltd<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

15


Project Economics/ Schedule<br />

•Capital Costs Estimated ~$220million<br />

•Annual Gross Revenues of ~$30million<br />

•Commercial Operation Date 2 nd Quarter 2007<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

16


<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

MORE CREEK 19 MW<br />

HYDROELECTRIC<br />

PROJECT


Project Locations<br />

Forrest Kerr<br />

Project<br />

Project Location<br />

More Creek<br />

Iskut River<br />

Project<br />

Bob Quinn Lake<br />

Eskay Creek<br />

Mine (Barrick)<br />

New Transmission<br />

Line<br />

N<br />

50 km<br />

Stewart<br />

Meziadin Junction<br />

(BC Hydro Grid)<br />

Hwy 37<br />

Existing Road Network<br />

USA<br />

CANADA<br />

Prince Rupert<br />

Terrace<br />

Smithers<br />

HWY 16 & CN Rail<br />

New Transmission Line<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

18


Key Project Facts<br />

Generation:<br />

Transmission:<br />

Project Timeline:<br />

• Green <strong>Power</strong> Project<br />

• Run-of-River facility<br />

• Installed capacity of 19.6 Mw<br />

• Plant capacity factor of ~55%<br />

• ~84 GwH annual production<br />

delivery point (Bob Quinn Lake Area)<br />

• Inter-connection with 138 kv grid near<br />

Bob Quinn Lake<br />

• New 13 km 69kV AC transmission line<br />

to be owned by the company<br />

• Two year procurement, construction,<br />

& commissioning time frame from financing<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

19


Advantages and Opportunities<br />

•Size of the Project 115 MW<br />

•Water Availability<br />

•Location in un-serviced area<br />

•Local market potential<br />

(est. 100MW)<br />

•Wheeling of power<br />

• Transmission line capacity<br />

(~1500Gwh)<br />

•Alaska intertie<br />

•<strong>North</strong>ern Utility<br />

(<strong>Coast</strong> <strong>Mountain</strong> Transmission <strong>Corp</strong>.)<br />

PROJECT<br />

SITE<br />

ALASKA<br />

TELEGRAPH<br />

CREEK<br />

DEASE LAKE<br />

ISKUT<br />

OIL GAS COAL BED<br />

METHANE<br />

MEZIADIN<br />

LOAD POTENTIAL<br />

<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

20


<strong>Coast</strong> <strong>Mountain</strong> <strong>Power</strong> <strong>Corp</strong>.<br />

Contact Information:<br />

Suite 707- 1281 West Georgia Street<br />

Vancouver, BC V6E 3J7<br />

www.coastmountainpower.ca<br />

Phone: 604-681-8680<br />

Fax: 604-681-8646