02.07.2012 Views

TUV Rheinland of North America, Inc.

TUV Rheinland of North America, Inc.

TUV Rheinland of North America, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>TUV</strong> <strong>Rheinland</strong> <strong>of</strong> <strong>North</strong> <strong>America</strong>, <strong>Inc</strong>.<br />

First Version 2002.4.4 JLIN rev.2 2002. 8.15<br />

Services for<br />

BLUETOOTH Qualification<br />

The easy access to global markets.<br />

The BLUETOOTH trademarks are owned by Bluetooth SIG, INC. U.S.A


Contents<br />

Introduction ............................................................................................................................................ 3<br />

<strong>TUV</strong> <strong>Rheinland</strong>'s Bluetooth projects ......................................................................................................... 4<br />

General Bluetooth related information ...................................................................................................... 5<br />

Documents necessary for a Bluetooth project ........................................................................................... 6<br />

1) First set <strong>of</strong> documents, necessary before preparation <strong>of</strong> the test plan ................................................... 6<br />

2) Second set <strong>of</strong> documents, necessary before testing starts ................................................................... 6<br />

3) Final set <strong>of</strong> documents necessary to complete the compliance folder .................................................... 6<br />

List <strong>of</strong> documents required for a Compliance Folder ................................................................................ 7<br />

Testing ................................................................................................................................................. 8<br />

Notes on confidentiality.......................................................................................................................... 9<br />

Your TÜV <strong>Rheinland</strong> contacts................................................................................................................ 10<br />

Appendix A: Levels <strong>of</strong> Service................................................................................................................ 11<br />

Appendix B: Customer Data Sheet ......................................................................................................... 12


Introduction<br />

An experienced Bluetooth Qualification Body (BQB) is now based in our Pleasanton <strong>of</strong>fice to answer and<br />

serve client needs to qualify and list Bluetooth hardware and s<strong>of</strong>tware components and products.<br />

Based on the experience <strong>of</strong> testing everything from RF modules, Baseband and Link manager chip sets, to<br />

protocol stacks and pr<strong>of</strong>ile applications, <strong>TUV</strong> <strong>Rheinland</strong> <strong>of</strong> <strong>North</strong> <strong>America</strong>, <strong>Inc</strong>. now <strong>of</strong>fers Bluetooth<br />

Qualification service from our Pleasanton Office.<br />

<strong>TUV</strong> <strong>Rheinland</strong> Berlin-Brandenburg has been a leader in the field <strong>of</strong> Bluetooth testing and certification in Asia,<br />

the location <strong>of</strong> the most important Bluetooth market up to now. Our facilities in Japan and Taiwan are BQTF<br />

accredited by the BQRB, and <strong>of</strong>fer a comprehensive range <strong>of</strong> testing and certification including RF, Baseband,<br />

Link Manager, Protocol stack, and Pr<strong>of</strong>iles. In addition, Korea and Hong Kong <strong>of</strong>fer similar capabilities.<br />

Manufacturers with testing and qualification needs can outsource qualification <strong>of</strong> Bluetooth products to any <strong>of</strong><br />

our facilities.


<strong>TUV</strong> <strong>Rheinland</strong>’s Bluetooth projects<br />

<strong>TUV</strong> <strong>Rheinland</strong> can navigate you a road to Bluetooth qualification:<br />

<strong>TUV</strong> <strong>Rheinland</strong> Client Comments<br />

BQB plan for<br />

qualification<br />

Issue <strong>of</strong><br />

quotation<br />

Preparation <strong>of</strong> Test<br />

Plan<br />

Compliant?<br />

Test Report and Data<br />

Test<br />

PASS<br />

BQB<br />

Assessment<br />

PASS<br />

Listing<br />

Initial Meeting<br />

Static Conformance<br />

("PICS") Review<br />

Meeting<br />

YES<br />

Intermediate<br />

Invoice<br />

FAIL<br />

Order<br />

Testing<br />

No<br />

Submission <strong>of</strong> remaining<br />

documents to complete<br />

the compliance folder<br />

(third set <strong>of</strong><br />

documents/information,<br />

ref. to following pages)<br />

Qualified Product<br />

Listing Notice,<br />

Test Report<br />

Submission <strong>of</strong> first set <strong>of</strong><br />

documents/information<br />

(ref. to following pages)<br />

Submission second set <strong>of</strong><br />

documents/information<br />

(ref. to following pages)<br />

General service and procedure introduction may be made free <strong>of</strong> charge at our Pleasanton <strong>of</strong>fice location.<br />

Please contact our sales team for an appointment.


General Bluetooth related information<br />

The information in this document gives a rough overview <strong>of</strong> procedures related to Bluetooth testing and listing<br />

projects through <strong>TUV</strong> <strong>Rheinland</strong>. This document is not designed to amend or replace <strong>of</strong>ficially published<br />

information from Bluetooth SIG, such as, but not limited to, the Licensing and Trademark regulations published<br />

in the Bluetooth Brand Book, or the Qualification Program Reference Document (PRD 1.0). For detailed<br />

information please refer to the <strong>of</strong>ficial Bluetooth Web-site at www.bluetooth.org.<br />

The one most important pre-requisite to any qualification and listing is for a company to be a Bluetooth<br />

“Promoter”, “Adopter”, or “Associate” member. The related adopters or associate agreements need to be upto-date.<br />

For listings, either a copy or web-based reference to that agreement is required.<br />

• Bluetooth Tests are classified according to category A, B, C, or D.<br />

Cat. A: Tests need to be done at an accredited BQTF (Bluetooth Qualified Testing Facility), such as our<br />

<strong>TUV</strong> <strong>Rheinland</strong> Japan and Taiwan facilities.<br />

Cat. B: Tests can be done by the SIG member as well as at any capable laboratory. Test evidence is<br />

required for the Compliance folder. <strong>TUV</strong> <strong>Rheinland</strong> Japan and Taiwan facilities <strong>of</strong>fer comprehensive<br />

testing services.<br />

Cat. C: Tests can be done by the SIG member as well as at any capable laboratory. Test evidence is not<br />

required in the Compliance folder, but the member has to provide a declaration that the product meets the<br />

requirements.<br />

Cat. D: These tests are not required and included in the testing specification for information only.<br />

• Upon listing, the following information are published by our BQB on the <strong>of</strong>ficial Bluetooth Web-site:<br />

- Name, address, Tel. Number, and main contact person <strong>of</strong> the applicant<br />

- Type designation, Model-, Hard- and S<strong>of</strong>tware-Version number <strong>of</strong> the listed product<br />

- Applicable Specification<br />

- Supported Protocols and Pr<strong>of</strong>iles, Test Specification<br />

- Pre-qualified components<br />

- if desired, company logo <strong>of</strong> the applicant


Documents necessary for a Bluetooth project<br />

Varied information is required for each project step. All documents can be submitted before the preparation <strong>of</strong><br />

the test plan. Depending on client preferences, the necessary documents can also be prepared on a step-bystep<br />

base. All documents, with the exception <strong>of</strong> the Declaration <strong>of</strong> Compliance (DoC, see final set <strong>of</strong><br />

documents) can be submitted electronically or as hardcopy.<br />

1) First set <strong>of</strong> documents, necessary before preparation <strong>of</strong> the test plan<br />

• Bluetooth Implementation Conformance Statement ICS, Protocol Implementation Conformance Statement<br />

PICS, and Pr<strong>of</strong>ile Implementation Conformance Statements Pr<strong>of</strong>ile-ICS for all applicable prot ocols and<br />

pr<strong>of</strong>iles (available on www.bluetooth.org). Copies <strong>of</strong> PICS from pre-qualified components are not<br />

acceptable.<br />

• Identification <strong>of</strong> qualified components, if utilized<br />

• Block or System diagram<br />

• In case <strong>of</strong> hardware-based devices and components, additional documentation requirements apply<br />

• Product Specification<br />

• For product families: Number <strong>of</strong> product variations and their differences<br />

• Planned listing date<br />

2) Second set <strong>of</strong> documents, necessary before testing starts<br />

Before testing, it is important to provide the most up-to-date ICS, PICS and Pr<strong>of</strong>ile-ICS. In case there are<br />

modifications, please inform us. All test planning are based on the information in these documents. Changes in<br />

ICS, PICS or Pr<strong>of</strong>ile ICS may and <strong>of</strong>ten do lead to changes in the test plan; qualification decisions will be<br />

affected accordingly<br />

• In case ICS, PICS, or Pr<strong>of</strong>ile-ICS have changed, final version <strong>of</strong> these documents<br />

• Operating instructions or description on how to operate the control interface(s) and s<strong>of</strong>tware (or API)<br />

• After testing, the test results, and the test report.<br />

3) Final set <strong>of</strong> documents necessary to complete the compliance folder<br />

Latest Declaration <strong>of</strong> Compliance (DoC) (available on www.bluetooth.org) with original signature. Copies,<br />

facsimile or electronic files are not acceptable for this document.<br />

Reference Design Application Note<br />

(only required for components, need to conform to TÜV <strong>Rheinland</strong>’s test plan)<br />

Parts List, if applicable<br />

Pattern Layout <strong>of</strong> all layers, if applicable<br />

Component Layout, if applicable<br />

Schematics, if applicable<br />

User- or Installation Manual<br />

Optionally the company logo in JPEG format (will be used when listing on the Bluetooth Webpage), max. size<br />

150 x 150 pixel


List <strong>of</strong> documents required for a Compliance Folder<br />

For your convenience below please find a comprehensive list <strong>of</strong> documents usually required for a Compliance<br />

Folder:<br />

Item Required Comments<br />

1. ICS Summary M<br />

2. ICS/PICS/Pr<strong>of</strong>ile-ICS M For all supported functions.<br />

3. Identification <strong>of</strong> pre-qualified<br />

M<br />

components<br />

4. Product Specification M <strong>Inc</strong>l. explanation <strong>of</strong> product variations and their<br />

differences<br />

5. Block diagrams (Hard- and S<strong>of</strong>tware) M For s<strong>of</strong>tware, system configuration and<br />

functional block diagrams<br />

6. User or Installation Manual M Only Bluetooth relevant portion<br />

7. Test Data M If testing is done by TÜV <strong>Rheinland</strong>, we will<br />

supply the test data directly to the Compliance<br />

Folder<br />

8. Test Report M For category A and B test cases<br />

9. Test conformance declaration M For category C test cases<br />

10. Original Declaration <strong>of</strong> Compliance M<br />

(DoC)<br />

11. Parts List M If applicable<br />

12. Pattern Layout (all layer) M If applicable<br />

13. Component layout M If applicable<br />

14. Circuit Diagrams M If applicable<br />

15. Revision History O Only necessary if product was modified during<br />

or between tests<br />

16. Reference Integration Note M/O Mandatory for component listing, optional for<br />

complete products.<br />

This document is attached to the listing on the<br />

Bluetooth Web Page<br />

17. Company logo O To be shown on the Bluetooth Listing Webpage,<br />

JPEG Format, max. 150 x 150 Pixel<br />

M: Mandatory<br />

O: Optional<br />

This list itself does not need to be returned to <strong>TUV</strong> <strong>Rheinland</strong>, only the documents referred to in this list are<br />

required.<br />

All these documents can be provided electronically or as hardcopy, only the Declaration <strong>of</strong> Compliance has to<br />

be provided as an original document with original signature.


Testing<br />

Currently, <strong>TUV</strong> <strong>Rheinland</strong> <strong>of</strong> <strong>North</strong> <strong>America</strong>, <strong>Inc</strong>. does not <strong>of</strong>fer in-house testing services. Referrals are<br />

possible to other testing houses, such as our BQTF test sites in Japan and Taiwan.


Notes on confidentiality<br />

<strong>TUV</strong> <strong>Rheinland</strong> is committed to its customers and takes every effort to handle customer’s projects with the<br />

greatest care. Complying with your confidentiality needs is one <strong>of</strong> our main priorities.<br />

Our general order conditions include <strong>TUV</strong> <strong>Rheinland</strong>’s commitment to confidentiality. However, if requested,<br />

we can enter into specific non-disclosure agreements.


Your T UV <strong>Rheinland</strong> contact in USA<br />

TÜV <strong>Rheinland</strong> <strong>of</strong> <strong>North</strong> <strong>America</strong>, <strong>Inc</strong>.<br />

For maps <strong>of</strong> our locations please refer to our Internet Homepage or contact us at any <strong>of</strong>fice.<br />

Internet Homepage:<br />

http://www.us .tuv.com<br />

San Francisco (Pleasanton <strong>of</strong>fice)<br />

Sales Department<br />

1279 Quarry Lane, Suite A<br />

Pleasanton, CA. 94566<br />

Tel.: 925-249-9123<br />

Fax:: 925-249-9124<br />

E-mail: info-sfr@us.tuv.com<br />

Bluetooth Qualification Body (BQB)<br />

John Lin<br />

Program Manager, Intentional Transmitters<br />

1279 Quarry Lane, Suite A<br />

Pleasanton, CA. 94566<br />

Tel.: 925-249-9123, ext. 120<br />

Fax: 925-249-9124<br />

E-mail: jlin@us.tuv.com


Appendix: A – Levels <strong>of</strong> Service<br />

Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Final Step<br />

Primer on<br />

<strong>TUV</strong>’s BQB<br />

service and<br />

how it can<br />

serve you<br />

Customer<br />

meets 1 to<br />

2 hours for<br />

a free<br />

introduction<br />

at our <strong>TUV</strong><br />

<strong>of</strong>fice in<br />

Pleasanton<br />

or at<br />

customer’s<br />

premise at<br />

cost*<br />

Issue<br />

quotation<br />

based on<br />

basic<br />

Bluetooth<br />

product<br />

information<br />

Customer<br />

decides on<br />

level <strong>of</strong><br />

support to<br />

purchase<br />

from <strong>TUV</strong>.<br />

Start <strong>of</strong> Level 1 Service<br />

Project<br />

planning<br />

upon<br />

receiving<br />

P.O. for the<br />

applicable<br />

service<br />

Product<br />

specifications<br />

are drafted<br />

based on<br />

<strong>TUV</strong> input<br />

First Version 2002.4.4 JLIN rev.2 2002. 8.15<br />

Start <strong>of</strong> Level 2 Service<br />

Detailed<br />

static<br />

conformance<br />

review (“PICS<br />

Review”)<br />

Customer<br />

implements<br />

necessary<br />

features or<br />

corrective<br />

actions<br />

Test Plan<br />

issued<br />

Level 1 Service: <strong>TUV</strong> will guide you through the qualification process for your project<br />

Level 2 Service: <strong>TUV</strong> will assist you to get the testing done right the first time<br />

Level 3 Service: If all you need is qualification and listing, this is for you<br />

*travel expenses, incidental<br />

Testing for<br />

category B<br />

and C test<br />

cases by<br />

customer or<br />

<strong>TUV</strong><br />

subcontracted<br />

site<br />

Start <strong>of</strong> Level 3 Service<br />

Review <strong>of</strong><br />

client test<br />

results and<br />

“Compliance<br />

Folder”<br />

Customer<br />

implements<br />

necessary<br />

corrective<br />

actions<br />

Qualification and listing on the<br />

Bluetooth SIG database.<br />

Combined with the necessary<br />

regulatory approvals for the<br />

target market, customer can<br />

sell the Bluetooth qualified<br />

products in the targeted areas.


Appendix: B- Customer Data Sheet<br />

CUSTOMER DATA<br />

Company:<br />

Address:<br />

Division:<br />

First Version 2002.4.4 JLIN rev.2 2002. 8.15<br />

SAP-CP No. Quotation No. Order No. Report No.<br />

Name (Title) E-Mail :<br />

Tel: Fax:<br />

NDA Contract <strong>TUV</strong>dotCOM Service Spurious Emission Test required Intended date <strong>of</strong> Listing<br />

PRODUCT DATA Yes No Yes No Yes No / /<br />

Product Name:<br />

Description:<br />

Intend to use Home/Car Use Commercial Use Business Use Industrial Use Other<br />

Category Hardware Component S<strong>of</strong>tware Component End-User Product<br />

Sale for Japan US EU France/Spain Other<br />

Regulatory TELEC required JATE required FCC required R&TTE required<br />

Bluetooth Applicable IP < version ><br />

Core Spec: TCRL : PRD :<br />

Product functions and construction details<br />

If product is a modified version <strong>of</strong> an earlier product, previous product name and versions:<br />

Antenna: Identical changed TX/RX circuitry: Identical changed<br />

DUN FAX LAN OBP FTP SYNC HD GAP SDAP SPP HF PAN HID<br />

PRN TCS INTERCOM<br />

Power Class Class I Class II Class III External Oscillator Internal Oscillator<br />

Baseband DSP<br />

Embedded CPU type : Operating system : Clock Speed :<br />

Link Manager Firmware<br />

Embedded CPU type : Operating system : Clock Speed :<br />

Pre-Qualified Components<br />

L2CAP SDP AVDTP<br />

RFCOMM BNEP AVCTP<br />

Item Name & Version BQB & BQTF Operating System, Hardware Environment (reference design application), Antenna

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!