Air Star Comfort 20 / 30 - Air Star AB

Air Star Comfort 20 / 30 - Air Star AB Air Star Comfort 20 / 30 - Air Star AB

26.10.2014 Views

Assembly Air Star Comfort 20/30 Work sequence for assembly recessed in wall 1. The ventilation unit must be mounted horizontally. Mark the dimensions on the wall. Outer box dimensions are width: 290 and height: 340 mm. Add 10-15 mm for insulation. 2. Drill a hole with a diameter 12-15 mm in each corner. Check the wall studs and any wires. Stagger the placement if necessary. 3. Cut with tiger saw. Deepen the recess to a depth suited to the wall structure. The outer box depth is 204 mm. The maximum recommended recess depth is 180 mm. 4. Important! Calculate the holes for the outer box so that there is room for at least 30 mm of insulation between the exterior wall and the back of the outer box. 5. Separate the ventilator from the outer box. Now slide the outer box into the opening and align with a spirit level. 6. Mark the location of the Spiro pipe on the remaining exterior wall using a circular bushing on the outer box’s back piece. Adapt the holes to suit the sleeve diameter and depth. (Sleeve dimensions Ø 123 mm and 41 mm deep). The remainder of the holes are drilled with Ø 100 mm + 10-15 mm of insulation around the Spiro pipe. 7. Now remove the outer box and drill the holes for the Spiro pipe. 8. Measure and cut the Spiro pipe to the correct length. Insert and fix the pipe in the proper position, the black rubber seal on the pipe should be facing the outer box sleeve. Finish by insulating around the pipe. 9. Installation of the outer box can be made with screw attachment or by fixing with sealing foam. 10. Slide in the outer box and press the Spiro tube into the outer box sleeve. Make sure the outer box is horizontal and vertical. Attach using a wooden wedge. At the screw attach ments, drill attachment holes in the outer box at the locations corresponding to the wall structure. 11. Screw or join the outer box to the wall so that it is secure. The screw attachment is always used with vibration damping material between the outer box and the wall. Make sure that the vibration damping material is not compressed too much and loses its function. (Risk of structure-borne sound in the wall). 12. Insulate around the outer box, and finish by fitting the cover frame (option). Before the assembly of the exterior wall grill, check that insulation has been placed around the pipe. 13. Clean the inside of the outer box before putting the ventilator in place. Carefully slide the unit so that the ventilator sleeve goes into the slot on the outer box sleeve. Connect the plug to the wall socket. Comfort 20/30 is now installed and ready for operation. Go to chapter: Use for setting the unit. User Manual 8 Version 1.6

Maintenance Air Star Comfort 20/30 7 1 Ventilator 2 3 4 5 1. Motor compartment 2. Front cover 3. Control for air change rate 4. Control for temperature 5. Connection for door cable 6. Outlet for power cable 7. Exhaust air duct 8. Supply air duct 8 6 Safety precautions • Before cleaning the ventilator, ensure that it is not connected to the mains. • The ventilator has a heating element. Wait about 15 minutes after the ventilator has been disconnected before starting to clean. • Be sure to wear respiratory protection for protection against dust. • The ventilator must not be rinsed with water. Warning! • If the power cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid any hazards. User Manual 9 Version 1.6

Assembly<br />

<strong>Air</strong> <strong>Star</strong> <strong>Comfort</strong> <strong>20</strong>/<strong>30</strong><br />

Work sequence for assembly recessed in wall<br />

1. The ventilation unit must be mounted horizontally. Mark the dimensions on the wall.<br />

Outer box dimensions are width: 290 and height: 340 mm. Add 10-15 mm for insulation.<br />

2. Drill a hole with a diameter 12-15 mm in each corner. Check the wall studs and any<br />

wires. Stagger the placement if necessary.<br />

3. Cut with tiger saw. Deepen the recess to a depth suited to the wall structure. The outer<br />

box depth is <strong>20</strong>4 mm. The maximum recommended recess depth is 180 mm.<br />

4. Important! Calculate the holes for the outer box so that there is room for at least <strong>30</strong> mm<br />

of insulation between the exterior wall and the back of the outer box.<br />

5. Separate the ventilator from the outer box. Now slide the outer box into the opening and<br />

align with a spirit level.<br />

6. Mark the location of the Spiro pipe on the remaining exterior wall using a circular bushing<br />

on the outer box’s back piece. Adapt the holes to suit the sleeve diameter and depth.<br />

(Sleeve dimensions Ø 123 mm and 41 mm deep). The remainder of the holes are drilled<br />

with Ø 100 mm + 10-15 mm of insulation around the Spiro pipe.<br />

7. Now remove the outer box and drill the holes for the Spiro pipe.<br />

8. Measure and cut the Spiro pipe to the correct length. Insert and fix the pipe in the proper<br />

position, the black rubber seal on the pipe should be facing the outer box sleeve. Finish by<br />

insulating around the pipe.<br />

9. Installation of the outer box can be made with screw attachment or by fixing with sealing<br />

foam.<br />

10. Slide in the outer box and press the Spiro tube into the outer box sleeve. Make sure the<br />

outer box is horizontal and vertical. Attach using a wooden wedge. At the screw attach<br />

ments, drill attachment holes in the outer box at the locations corresponding to the wall<br />

structure.<br />

11. Screw or join the outer box to the wall so that it is secure. The screw attachment is always<br />

used with vibration damping material between the outer box and the wall. Make sure<br />

that the vibration damping material is not compressed too much and loses its function.<br />

(Risk of structure-borne sound in the wall).<br />

12. Insulate around the outer box, and finish by fitting the cover frame (option). Before the<br />

assembly of the exterior wall grill, check that insulation has been placed around the pipe.<br />

13. Clean the inside of the outer box before putting the ventilator in place. Carefully slide the<br />

unit so that the ventilator sleeve goes into the slot on the outer box sleeve. Connect the<br />

plug to the wall socket.<br />

<strong>Comfort</strong> <strong>20</strong>/<strong>30</strong> is now installed and ready for operation. Go to chapter: Use for<br />

setting the unit.<br />

User Manual 8 Version 1.6