SUBMITTALS<br />

https://projectdox.freese.com/imarkupwg/form.asp?formid=6390&wfdirect=&debug=&co...<br />

Page 2 of 2<br />

2/26/20<strong>12</strong><br />

REVIEWER<br />

COMMENTS:<br />

Motor Operators:<br />

1. Approved as Noted. Additional information required. Formally address all comments in<br />

writing. Provide revised data per review comments.<br />

2. Show contacts for REMOTE ENABLED output. Terminations shall be labeled per the FNI<br />

control schematics. Update control schematics to reflect this.<br />

3. Control schematics shall show what valve it is associated with. Just showing Line Item: 4,<br />

etc. is not acceptable.<br />

4. All motor operator drawings shall state what valve they are associated with.<br />

5. The hook-up diagram shows 24 VDC being supplied by the Customer. We are not providing<br />

24 VDC to the valves. Any power required to operate the valve shall be provided internally. The<br />

only power source being supplied is 480V, 3 phase.<br />

6. Provide open/close indicating lights.<br />

7. Per the FNI control schematics, only a remote OPEN and remote CLOSE signal are being<br />

provided to the operator. A remote STOP signal is not being supplied. Also, since only one<br />

common terminal is being provided in the operator for terminating the common wire<br />

associated with the remote STOP and OPEN, clarify how many field wires and what size wires<br />

can be terminated to this terminal. FNI will be running 2 separate wires for each remote OPEN<br />

and remote CLOSE signal. Therefore the common terminal would need to be able to terminate 2<br />

#14 AWG field wires.<br />

8. Verify whether a space heater is being provided for the operators. This was not shown on<br />

control schematics/wiring diagrams.<br />

9. Verify that the installation drawings for the motor operators provided by Rotork match those<br />

that Pratt is providing.<br />

REVIEWER NAME: REVIEWER EMAIL: COMPANY / ORGANIZATION DATE SENT: DATE<br />

COMPLETED:<br />

Rebecca<br />

Sandoval<br />

rs@freese.com<br />

Freese and Nichols, Inc<br />

2/21/20<strong>12</strong><br />

2/22/20<strong>12</strong><br />

REVIEWER<br />

COMMENTS:<br />

2/22/<strong>12</strong><br />

The following comments refer to the Motor Operators and the Limit Switches for TPS-YP5-<br />

BFV1.<br />

Refer to Jeff Hensley for comments.<br />

Approved as Noted.<br />

UPLOAD SUPPORTING REVIEW DOCUMENTS<br />

DISPLAY ROUTING SLIP<br />

Current Workflow Step: DCS Admin: Debby Greer Workflow Initiator: Jeff Cohen<br />

(Click on the Names above to Email User)<br />

FNI Forms v1.04