26.10.2014 Views

33 12 16.26 - 001-A - Response AAN-ANR Butterfly Valves - Garney ...

33 12 16.26 - 001-A - Response AAN-ANR Butterfly Valves - Garney ...

33 12 16.26 - 001-A - Response AAN-ANR Butterfly Valves - Garney ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Garney</strong> Construction<br />

785 E Warren<br />

Gardner, KS 66030<br />

Phone: 816-278-5950<br />

Fax: 816-278-5931<br />

SUBMITTAL ITEM<br />

NO. <strong>33</strong> <strong>12</strong> 1626-<strong>001</strong><br />

PACKAGE NO: <strong>33</strong> <strong>12</strong> 1626<br />

TITLE:<br />

PROJECT:<br />

<strong>Butterfly</strong> <strong>Valves</strong><br />

Ward County Pump Station Project<br />

REQUIRED START:<br />

REQUIRED FINISH:<br />

2/15/20<strong>12</strong><br />

3/7/20<strong>12</strong><br />

DRAWING:<br />

STATUS:<br />

BIC:<br />

<strong>ANR</strong><br />

HP<br />

DAYS HELD: 0<br />

DAYS ELAPSED: 11<br />

DAYS OVERDUE: -10<br />

RECEIVED FROM<br />

HP<br />

DB<br />

SENT TO<br />

FNI<br />

NL<br />

RETURNED BY<br />

FNI NL<br />

FORWARDED TO<br />

HP<br />

DB<br />

Revision<br />

No.<br />

Drawing<br />

Description 9. Verify that / the Remarks installation drawings Receivedfor the Sent motor operators Returned provided Forwarded by Rotork Status match Sepias those Prints that Pratt Date is providing. HeldElapsed<br />

Rebecca Sandoval Comments:<br />

The following comments refer to the Motor Operators and the Limit Switches for TPS-YP5-BFV1.<br />

Refer to Jeff Hensley for comments.<br />

Approved as Noted.<br />

<strong>Garney</strong> Construction<br />

Ward County Pump Station Project<br />

Submittal No. <strong>33</strong> <strong>12</strong> 1626-<strong>001</strong><br />

This submittal has been reviewed and approved with respect to<br />

the contract documents and specification section<strong>33</strong> <strong>12</strong> 1626<br />

Approval or acceptance of the submittal does not relieve the<br />

vendor of their responsibility to comply with the contract<br />

documents.<br />

Supplier/Sub:<br />

HP<br />

Date: ______________ Reviewed by: _________________<br />

®<br />

Expedition Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!