25.10.2014 Views

the Aravind Eye Hospital Telemedicine Project - Courses

the Aravind Eye Hospital Telemedicine Project - Courses

the Aravind Eye Hospital Telemedicine Project - Courses

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Things I Thought I’d Never Do<br />

Sonesh Surana<br />

I290: Designing Rural Computing Applications<br />

Guest Lecture<br />

November 4, 2008


Timeline<br />

2004<br />

1 day<br />

2005<br />

107 days<br />

2006<br />

26 days<br />

2008<br />

12 days<br />

Total<br />

146 days<br />

Aug<br />

2004:<br />

1 day<br />

June<br />

2005:<br />

24<br />

days<br />

Dec<br />

2005:<br />

37<br />

days<br />

Oct<br />

2006:<br />

20<br />

days<br />

Jan<br />

2005:<br />

25<br />

days<br />

Aug<br />

2005:<br />

21<br />

days<br />

Feb<br />

2006:<br />

6<br />

days<br />

Jan<br />

2008:<br />

12<br />

days


Photo acknowledgment: Francis Kpobe, Ghana


Tower Challenges?


Training Challenges?


“So <strong>the</strong>n we put <strong>the</strong> separate modem at<br />

chimney now <strong>the</strong> link has been up it means<br />

, in Theni router-3 we put <strong>the</strong> ath1 card and<br />

it is focusing <strong>the</strong> new separate modem at<br />

chimney.<br />

We have pointed out one think ie we put<br />

<strong>the</strong> new wireless card in <strong>the</strong> existing<br />

modem(suppose we put <strong>the</strong> ath1 in , Theni<br />

router-3 , already it connected to SBS<br />

through ath0) <strong>the</strong> link quality will be down).”


Power Challenges?


Poor Quality Power<br />

Voltage Range<br />

Number of Instances seen over 6 weeks<br />

Spikes and Swells:<br />

• Lost 50 power adapters<br />

• Burned 30 PoE ports<br />

Low Voltages:<br />

• Incomplete boots<br />

• HW watchdog fails<br />

Frequent Fluctuations:<br />

• CF corruptions<br />

• Battery Damage<br />

23


What about UPS?<br />

“Affordable” UPS systems ($300) are of standby-type<br />

• Primary source is grid<br />

• Secondary source is battery<br />

• Good quality power supplied only during outage!<br />

24


Real Cost of Power<br />

Assume 7W<br />

Monthly Costs<br />

• Grid: $0.25<br />

• UPS + Battery: $6.08 (24X more!!)<br />

• 50W Panel + Controller + Battery: $8.24<br />

25


Some Results


Operational Results<br />

Migration at <strong>Aravind</strong><br />

TIER, UC Berkeley<br />

<strong>Aravind</strong><br />

Local Vendor<br />

Maintenance<br />

Management<br />

Installation<br />

Equipment Supply<br />

Jan’06 – Jun’06<br />

Jul’06 – Dec’06<br />

Jan’07 – Jun’07<br />

Jun’07 – Dec’07<br />

2007: 5 more clinic links<br />

27


Number of Patients<br />

0<br />

Feb-06<br />

Sep-08<br />

Jan-06<br />

Aug-08<br />

Mar-06<br />

Apr-06<br />

May-06<br />

Jun-06<br />

Jul-06<br />

Aug-06<br />

Sep-06<br />

Oct-06<br />

Nov-06<br />

Dec-06<br />

Jan-07<br />

Feb-07<br />

Mar-07<br />

Apr-07<br />

May-07<br />

Jun-07<br />

Jul-07<br />

Aug-07<br />

Sep-07<br />

Oct-07<br />

Nov-07<br />

Dec-07<br />

Jan-08<br />

Feb-08<br />

Mar-08<br />

Apr-08<br />

May-08<br />

Jun-08<br />

Jul-08<br />

5000<br />

4500<br />

4000<br />

3500<br />

3000<br />

2500<br />

2000<br />

1500<br />

1000<br />

500<br />

Patient Throughput<br />

90,000 patients screened; vision restored for 15,858<br />

Kallidakurchi<br />

Srivaikundam<br />

Sholavandan<br />

Tirupovanam<br />

Alanganallur<br />

Andipatti<br />

Periyakulum<br />

Chinnamanur<br />

Bodi<br />

Ambasamudram<br />

Time in Months (Jan 2006 to September 2008)


Thank<br />

You!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!