Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

AT Power for Feeder: East Corridor - East<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

1.0<br />

0.9<br />

0.8<br />

Average Power (MW, MVA, MVAR)<br />

0.7<br />

0.6<br />

0.5<br />

0.4<br />

0.3<br />

0.2<br />

0.1<br />

0.0<br />

PS-1<br />

AT Name<br />

PS-2<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

LTK RR v13.8.2.0<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

AT Power for Feeder: Gold Line - West<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

Average Power (MW, MVA, MVAR)<br />

0.66<br />

0.64<br />

0.62<br />

0.60<br />

0.58<br />

0.56<br />

0.54<br />

0.52<br />

0.50<br />

0.48<br />

0.46<br />

0.44<br />

0.42<br />

0.40<br />

0.38<br />

0.36<br />

0.34<br />

0.32<br />

0.30<br />

0.28<br />

0.26<br />

0.24<br />

0.22<br />

0.20<br />

0.18<br />

0.16<br />

0.14<br />

0.12<br />

0.10<br />

0.08<br />

0.06<br />

0.04<br />

0.02<br />

0.00<br />

PS-3<br />

AT Name<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

LTK RR v13.8.2.0<br />

Figure 27 -<br />

AT Power Demands, PS-1, PS-2, PS-3 – Argo Substation Out Of Service<br />

02/27/2009 FRSC Page 89 of 250