Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Argo TPSS out-of-service<br />
Auto-Transformer System<br />
AT-2MVA X-1.5%; SS-10MVA<br />
AT Power for Feeder: East Corridor - East<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVA R Avg<br />
1.0<br />
0.9<br />
0.8<br />
Average Power (MW, MVA, MVAR)<br />
0.7<br />
0.6<br />
0.5<br />
0.4<br />
0.3<br />
0.2<br />
0.1<br />
0.0<br />
PS-1<br />
AT Name<br />
PS-2<br />
C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />
Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />
Run Date and Time: 08-Jan-2009 06:35:44<br />
LTK RR v13.8.2.0<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Argo TPSS out-of-service<br />
Auto-Transformer System<br />
AT-2MVA X-1.5%; SS-10MVA<br />
AT Power for Feeder: Gold Line - West<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVA R Avg<br />
Average Power (MW, MVA, MVAR)<br />
0.66<br />
0.64<br />
0.62<br />
0.60<br />
0.58<br />
0.56<br />
0.54<br />
0.52<br />
0.50<br />
0.48<br />
0.46<br />
0.44<br />
0.42<br />
0.40<br />
0.38<br />
0.36<br />
0.34<br />
0.32<br />
0.30<br />
0.28<br />
0.26<br />
0.24<br />
0.22<br />
0.20<br />
0.18<br />
0.16<br />
0.14<br />
0.12<br />
0.10<br />
0.08<br />
0.06<br />
0.04<br />
0.02<br />
0.00<br />
PS-3<br />
AT Name<br />
C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />
Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />
Run Date and Time: 08-Jan-2009 06:35:44<br />
LTK RR v13.8.2.0<br />
Figure 27 -<br />
AT Power Demands, PS-1, PS-2, PS-3 – Argo Substation Out Of Service<br />
02/27/2009 FRSC Page 89 of 250