24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

<strong>AC</strong> Substation Average Power<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

9.0<br />

8.5<br />

8.0<br />

7.5<br />

Average Power (MW, MVA, MVAR)<br />

7.0<br />

6.5<br />

6.0<br />

5.5<br />

5.0<br />

4.5<br />

4.0<br />

3.5<br />

3.0<br />

2.5<br />

2.0<br />

1.5<br />

1.0<br />

0.5<br />

0.0<br />

Sandown SS_t1<br />

Substation<br />

Sandown SS_t2<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

LTK RR v13.8.2.0<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

<strong>AC</strong> Substation Peak Average Power<br />

Run Duration: 02:00:00<br />

1 Min. 15 Min. 1 Hr 2 Hr Run<br />

15.0<br />

14.0<br />

13.0<br />

12.0<br />

Peak Average Power (MVA)<br />

11.0<br />

10.0<br />

9.0<br />

8.0<br />

7.0<br />

6.0<br />

5.0<br />

4.0<br />

3.0<br />

2.0<br />

1.0<br />

0.0<br />

Sandown SS_t1<br />

Substation<br />

Sandown SS_t2<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

LTK RR v13.8.2.0<br />

Figure 25 -<br />

Sandown Substation Power Demands - Argo Substation Out Of Service<br />

02/27/2009 FRSC Page 87 of 250