24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

Train Voltages for Route: Gold Line - WB<br />

Run Duration: 02:00:00<br />

Elevation Stations Route Trains<br />

Voltage<br />

0.994<br />

0.992<br />

0.990<br />

0.988<br />

0.986<br />

0.984<br />

0.982<br />

0.980<br />

0.978<br />

0.976<br />

0.974<br />

0.972<br />

0.970<br />

0.968<br />

0.966<br />

0.964<br />

0.962<br />

EL(ft)<br />

200<br />

100<br />

0<br />

0.0<br />

1.0<br />

2.0<br />

3.0<br />

4.0<br />

5.0<br />

6.0<br />

Route Location (miles)<br />

7.0<br />

8.0<br />

9.0<br />

10.0<br />

11.0<br />

Denver Union Station<br />

41st Ave<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

Pecos<br />

Federal<br />

Sheridan<br />

Olde Town<br />

Arvada Ridge<br />

Ward Rd<br />

_route_end_<br />

LTK RR v13.8.2.0<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo TPSS out-of-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

Train Voltages for Route: Gold Line - EB<br />

Run Duration: 02:00:00<br />

Elevation Stations Route Trains<br />

Voltage<br />

0.994<br />

0.992<br />

0.990<br />

0.988<br />

0.986<br />

0.984<br />

0.982<br />

0.980<br />

0.978<br />

0.976<br />

0.974<br />

0.972<br />

0.970<br />

0.968<br />

0.966<br />

0.964<br />

0.962<br />

0<br />

EL(ft)<br />

-100<br />

-200<br />

-300<br />

0.0<br />

1.0<br />

2.0<br />

3.0<br />

4.0<br />

5.0<br />

6.0<br />

Route Location (miles)<br />

7.0<br />

8.0<br />

9.0<br />

10.0<br />

11.0<br />

_route_begin_<br />

Ward Rd<br />

Arvada Ridge<br />

Olde Town<br />

Sheridan<br />

Federal<br />

Pecos<br />

41st Ave<br />

Denver Union Station<br />

C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo out - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:35:44<br />

LTK RR v13.8.2.0<br />

Figure 23 -<br />

Voltage Profile Gold Line – Argo Substation Out Of Service<br />

02/27/2009 FRSC Page 85 of 250