<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

The Appendix D presents the following data for Argo substation out of service operating condition:<br />

• Voltage profiles in per unit for the following:<br />

o East Corridor Eastbound<br />

o East Corridor Westbound<br />

o Gold Line Eastbound<br />

o Gold Line Westbound<br />

o North Metro Corridor Northbound<br />

o North Metro Corridor Southbound<br />

• Substation transformer power demands<br />

o Sandown Substation<br />

• Autotransformer power demands<br />

o SW-1<br />

o PS-1<br />

o PS-2<br />

o PS-3<br />

o PS-4<br />

o PS-5<br />

o PS-6<br />