<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

APPENDIX D – ELECTRICAL RESULTS - ARGO SUBSTATION OUT<br />

OF SERVICE, TWO TRANSFORMERS IN SANDOWN SUBSTATION<br />

AND TWO TRANSFORMERS IN ARGO SUBSTATION<br />

02/27/2009 FRSC Page 81 of 250