Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo & Sandow n TPSS in-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

AT Power for Feeder: North Metro<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

1.1<br />

1.0<br />

0.9<br />

Average Power (MW, MVA, MVAR)<br />

0.8<br />

0.7<br />

0.6<br />

0.5<br />

0.4<br />

0.3<br />

0.2<br />

0.1<br />

0.0<br />

PS-4<br />

PS-5<br />

AT Name<br />

PS-6<br />

C:\...\Argo & Sandow n TPSS in-service\AT-2MVA,1.5% SS-10MVA\<strong>RTD</strong> - Scenario #3 All Subs In - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:04:26<br />

LTK RR v13.8.2.0<br />

Figure 21 -<br />

AT Power Demands, PS-4, PS-5, PS-6 – All Systems In Service<br />

02/27/2009 FRSC Page 80 of 250