24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo & Sandow n TPSS in-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

AT Power for Feeder: EC Phase Bus 1 to T-Splice Bus 2<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

Average Power (MW, MVA, MVAR)<br />

0.29<br />

0.28<br />

0.27<br />

0.26<br />

0.25<br />

0.24<br />

0.23<br />

0.22<br />

0.21<br />

0.20<br />

0.19<br />

0.18<br />

0.17<br />

0.16<br />

0.15<br />

0.14<br />

0.13<br />

0.12<br />

0.11<br />

0.10<br />

0.09<br />

0.08<br />

0.07<br />

0.06<br />

0.05<br />

0.04<br />

0.03<br />

0.02<br />

0.01<br />

0.00<br />

Phase Brk AT-1<br />

AT Name<br />

C:\...\Argo & Sandow n TPSS in-service\AT-2MVA,1.5% SS-10MVA\<strong>RTD</strong> - Scenario #3 All Subs In - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:04:26<br />

LTK RR v13.8.2.0<br />

Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />

Argo & Sandow n TPSS in-service<br />

Auto-Transformer System<br />

AT-2MVA X-1.5%; SS-10MVA<br />

AT Power for Feeder: East Corridor - West<br />

Run Duration: 02:00:00<br />

MVA Avg MW Avg MVA R Avg<br />

0.16<br />

0.15<br />

0.14<br />

0.13<br />

Average Power (MW, MVA, MVAR)<br />

0.12<br />

0.11<br />

0.10<br />

0.09<br />

0.08<br />

0.07<br />

0.06<br />

0.05<br />

0.04<br />

0.03<br />

0.02<br />

0.01<br />

0.00<br />

Phase Brk AT-2<br />

AT Name<br />

C:\...\Argo & Sandow n TPSS in-service\AT-2MVA,1.5% SS-10MVA\<strong>RTD</strong> - Scenario #3 All Subs In - AT-2MVA,1.5% SS-10MVA rev2.rr<br />

Netw ork Type: <strong>AC</strong>; Netw ork Is: On<br />

Run Date and Time: 08-Jan-2009 06:04:26<br />

LTK RR v13.8.2.0<br />

Figure 19 -<br />

AT Power Demands, SW-1 – All Systems In Service<br />

02/27/2009 FRSC Page 78 of 250