Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Vehicle Data<br />

A summary of the sources for the vehicle data are listed below;<br />

[1] <strong>RTD</strong> EMU–DMU <strong>Commuter</strong> <strong>Rail</strong> Passenger <strong>Rail</strong>car Procurement Technical Provisions,<br />

Draft for Industry Review, dated July 7, 2008<br />

Assumed propulsion system efficiencies and power factors were taken from [2] for estimates of<br />

the Arrow IV EMU.<br />

[2] Amtrak Energy Management: Usage/Capacity Study, Data Collection (“Day 90”) <strong>Report</strong>,<br />

SYSTRA Engineering Inc., dated July 15, 2004<br />

<strong>RTD</strong> operating plan, including hours of operations, headway, end-of-route turn times, and<br />

station dwells, are consistent with:<br />

[3] "Gold Line and East Corridor Operations Plans," dated September 4, 2008<br />

(These reports define the East Corridor and Gold Line services for 2030 only)<br />

[4] "North Metro Corridor 2008 APE Service Plans – 2015 & 2030," dated May 20, 2008<br />

[5] <strong>Commuter</strong> <strong>Rail</strong> Operations and Maintenance Cost Estimate <strong>Report</strong>, Rev. 4, dated<br />

December 5, 2008<br />

The 35 second dwell time was first documented in:<br />

[6] FRSC-06-005 Operating Cost Comparison of Candidate Technologies for <strong>Commuter</strong><br />

<strong>Rail</strong> Corridors in the Denver Regional Transportation District, Rev. 2, dated October 4,<br />

2006<br />

[7] FRSC-06-006 FasTracks Trip Times and Energy <strong>Simulation</strong>s, Rev. 2, dated October 4,<br />

2006<br />

02/27/2009 FRSC Page 59 of 250